My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2000-222 AUTHORIZING THE EXECUTION OF AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2000
>
R2000-222 AUTHORIZING THE EXECUTION OF AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2016 10:32:14 AM
Creation date
3/29/2016 10:32:12 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2000-222
Res Ord Title
AUTHORIZING THE EXECUTION OF AN AGREEMENT FOR ENGINEERING SERVICES ION EXCHANGE TREATMENT FACILITY CONSTRUCTION PHASE - CITY PROJECT 9953
Approved Date
11/6/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Specific services to be performed by the Resident Project Representative shall be as <br /> follows: <br /> A. Site Observations and Liaison with Owner and Contractor. <br /> 1. Conduct onsite observations of the general progress of the work to assist <br /> Engineer in determining if the work is proceeding in accordance with the <br /> construction contract documents. <br /> 2. Serve as Engineer's liaison with Contractor, working principally through <br /> Contractor's superintendent, and assist Engineer in providing interpretation of <br /> the construction contract documents. Transmit Engineer's clarifications and <br /> interpretations of the construction contract documents to Contractor. <br /> 3. Assist EnginePr in se�ving as Owner's liaison with Contractor when <br /> Contractor's operations affect Owner's onsite operation. <br /> 4. As requested by Engineer, assist in obtaining from Owner additional details or <br /> information when required at the jobsite for proper execution of the work. <br /> 5. Report to Engineer, giving opinions and suggestions based on the Resident <br /> Project Representative's observations regarding defects or deficiencies in the <br /> Contractor's work and relating to compliance with drawings, specifications, and <br /> design concepts. <br /> 6. Advise Engineer and Contractor or its superintendent immediately of the <br /> commencement of any work requiring a shop drawing or sample submission if <br /> the submission has not been accepted by Engineer. <br /> 7. Monitor changes of apparent integrity of the site (such as differing subsurface <br /> and physical conditions, existing structures, and site-related utilities when such <br /> utilities are exposed) resulting from construction-related activities. <br /> 8. Observe pertinent site conditions when Contractor maintains that differing <br /> subsurface and physical conditions have been encountered, and document <br /> actual site conditions. Review and analysis of Contractor claims for differing <br /> subsurface and physical conditions are supplemental services. <br /> 9. Verify that Contractor has contacted utilities in the general construction area <br /> and advised them of Contractor's schedule. Assist in coordinating scheduling <br /> of utility activities to minimize conflicts with Owner's activities. <br /> A-4 <br /> City of Decatur SWTP <br /> 10/26/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.