Laserfiche WebLink
- � This is EXffiBIT B, consisting of 2 pages,referred to in and <br /> ' ' part of the Agreement between OWNER and ENGINEER for <br /> Professional Services date 11/7 ,2000 <br /> Initial: <br /> OWNER <br /> ENGINEER <br /> OWNER's Responsibilities <br /> �� �7 <br /> Article 2 of the A eement is amended and s 1 m nted to include the f 11 <br /> u e e o owin a eement of the arties. <br /> �' pP g �' P <br /> B2.01 In addition to other responsibilities of OWNER as set forth in this Agreement, OWNER shall: <br /> A. Provide ENGINEER with all criteria and full information as to OWNER's requirements for the Project,including <br /> design objectives and constraints, space, capacity and performance requirements, flexibility, and expandability, and any <br /> budgetary limitations; and furnish copies of all design and construction standards which OWNER will require to be <br /> included in the Drawings and Specifications; and furnish copies of OWNER's standard forms, conditions, and related <br /> documents for ENGINEER to include in the Bidding Documents,when applicable. <br /> B. Furnish to ENGINEER any other available information pertinent to the Project including reports and data relative <br /> to previous designs,or investigations at or adjacent to the Site. , <br /> C. Following ENGINEER's assessment of initially-available Project information and data and upon ENGINEER's <br /> request, furnish or otherwise make available such additional Project related information and data as is reasonably required <br /> to enable ENGINEER to complete its Basic and Additional Services. If the OWNER deems that such additional , <br /> information is not readily available, the OWNER may negotiate with ENGINEER toprovide Additional Services to , <br /> obtain such information as set forth in Part 2 of Exhibit A of the Agreement as requirer� Such additional information 'I <br /> or data would generally include the following: I <br /> 1. Property descriptions. II <br /> 2. Zoning, deed, and other land use restrictions. <br /> 3. Property,boundary,easement,right-of-way, and other special surveys or data,including establishing relevant <br /> reference points. <br /> 4. Explorations and tests of subsurface conditions at or contiguous to the Site,drawings of physical conditions in <br /> or relating to existing surface or subsurface structures at or contiguous to the Site, or hydrographic surveys,with <br /> appropriate professional interpretation thereof. <br /> 5. Environmental assessments, audits,investigations and impact statements, and other relevant environmental or <br /> cultural studies as to the Project,the Site, and adjacent areas. <br /> 6. Data or consultations as required for the Project but not otherwise identified in the Agreement or the E�chibits <br /> thereto. <br /> D. Give prompt written notice to ENGINEER whenever OWNER observes or otherwise becomes aware of a <br /> Hazardous Environmental Condition or of any other development that affects the scope or time of performance of <br /> ENGINEER's services,or any defects or nonconformance in ENGINEER's services or in the work of any Contractor. <br /> E. Authorize ENGINEER to provide Additional Services as set forth in Part 2 of Exhibit A of the Agreement as <br /> required. <br /> (Exhibit B—OWNER's Responsibilities) <br /> 1 <br />