Laserfiche WebLink
� � T'his is EX�iIBIT A, consisting of 4 pages,referred to in and <br /> ` ' part of the Agreement between OWNER and ENGINEER for <br /> Professional Services date 11/7 , 2000 . <br /> Initial: <br /> OWNER <br /> ENGINEER I <br /> l �? '� <br /> ENGINEER'S Services I <br /> Article 1 of the Agreement is amended and supplemented to include the following agreement of the parties. ENGINEER � <br /> shall provide Basic and Additional Services as set forth below. <br /> PART 1 —BASIC SERVICES <br /> A1.01 Study and Report Phase <br /> A. ENGINEER shall: <br /> 1. Consult with OWNER to define and clarify OWNER's requirements for the Project and available data. <br /> 2. Advise OWNER as to the necessity of OWNER's providing data or services of the types described in Exhibit <br /> B,which are not part of the ENGINEER's Basic Services, and assist OWNER in obtaining such data and services. <br /> 3. Identify, consult with, and analyze requirements of governmental authorities having jurisdiction to approve <br /> the portions of the Project designed or specified by ENGINEER, including but not limited to mitigating measures <br /> identified in the environmental assessment. <br /> 4. Identify and evaluate two (normal water and low water level)alternate solutions for each of the three sites <br /> available to OWNER and, after consultation with OWNER,recommend to OWNER those solutions,which in <br /> ENGINEER's judgment meet OWNER's requirements for the Project. <br /> 5. Prepare a report(the"Report"),which will, as appropriate, contain schematic layouts, sketches and <br /> conceptual design criteria with appropriate exhibits to indicate the agreed-to requirements. This Report will be <br /> accompanied by ENGINEER's opinion of Total Project Costs for each solution which is so recommended for the <br /> Project with each component separately itemized,including the following,which will be separately itemized: opinion <br /> of probable Construction Cost, allowances for contingencies and for the estimated total costs of design,professional <br /> and related services provided by ENGINEER and, on the basis of infortnation furnished by OWNER, allowances for <br /> other items and service included within the definition of Total Project Costs. <br /> 6. Perform or provide the following additional Study and Report Phase tasks or deliverables: <br /> 7. Furnish 3 review copies of the Report to OWNER within 60 days of authorization to begin services and <br /> review it with OWNER. <br /> 8. Revise the Report in response to OWNER's and other parties' comments, as appropriate, and furnish 6 <br /> final copies of the revised Report to the OWNER within 15 days after completion of reviewing it with OWNER. <br /> B. ENGINEER's services under the Study and Report Phase will be considered complete on the date when the final <br /> copies of the revised Report have been delivered to OWNER. <br /> (Exhibit A—ENGINEER's Services) <br /> 1 <br />