Laserfiche WebLink
y � 1 <br /> Appendix I <br /> LAKE DECATUR DAM REHABILITATION <br /> PRELIMINARY CONSTRUCTION DRAWING LIST <br /> Hours to <br /> Title No. of Drawings Complete <br /> Key Map and Project Location Map 1 18 <br /> General Plan 1 18 <br /> Existing Spillway—Plan and Sections' 2 0 <br /> Spillway Access Platform Concrete Rehabilitation — Plan, Sections, and <br /> Details 2 84 <br /> Spillway Overlay Concrete Rehabilitation—Plans,Sections,and Details 2 84 <br /> Left Embankment Erosion Stabilization—Sections and Details 1 42 <br /> Outlet Works and End Sill Concrete Rehabilitation — Plans, Sections, and <br /> Details 2 84 <br /> Total 11 330 <br /> ' Assume existing drawings will be used. <br /> Task 4-Bid Support <br /> Harza will attend a pre-bid meeting at the site and answer questions from interested bidders. The City may <br /> wish to prequalify contractors by issuing a Request for Statement of Qualifications prior to issuing the bid <br /> package so that bid packages will be issued only to bidders capable of doing the work. Harza will review the <br /> submissions during the prequalification process,and issue a letter of recommendation to the City on the basis of <br /> this review. <br /> At the completion of the bid period, Harza will review the bids received by the City for technical content and <br /> pricing and prepare a summary report. We anticipate that the City and its attorneys will review the proposed <br /> contract terms and conditions. <br /> Page 11 of 15 <br />