Laserfiche WebLink
� OF'�FC <br /> h 9.� <br />� - C <br /> V - 70 <br /> _ <br /> r�\'��� <br /> '/[LINO\Y <br /> October 31,2000 <br /> ENGINEERING & INFRASTRUCTURE MEMORANDUM <br /> NO. 2000 - 24 <br /> MEMORANDUM TO: Honorable Mayor and City Council <br /> FROM: Steve Garman, City Manager <br /> Stephen Swanson, P. E.,Acting Dir. of Eng. & Infrastructure��� <br /> Kris Quandt, E.I.T., Civil Engineer I �.!cL <br /> SUBJECT: North Charles Storm Water <br /> City Project 2000-18 <br /> The City Council at its meeting of October 2, 2000 authorized staff to proceed with the <br /> design of the North Charles Street drainage improvements and to advertise for bids. These <br /> improvements are to correct local drainage problems particularly in the backyards of residents <br /> along the east side of North Charles Street immediately south of Running Reds Boulevard (refer <br /> to attached locale map). <br /> The Engineering Division prepared the plans and specifications for the project. Bids <br /> were received and opened on October 26, 2000. The results (copy of the bid tabulation is <br /> attached) of the letting are as follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over(,Under� <br /> Engineer's Estimate $53,375.00 ------- <br /> Bodine Services, Inc. $57,415.00 7.57 <br /> Entler Excavating Co., Inc. $60,127.50 12.65 <br />