Laserfiche WebLink
.- � _ <br /> OF'�EC' <br /> � �9� <br /> V -_ A <br /> _�� <br /> �it� <br /> '/[l I N O�`'� <br /> September 25, 2000 <br /> WATER MANAGEMENT MEMORANDUM <br /> NO. 2000 - 08 <br /> MEMORANDUM TO: Honorable Mayor and City Council <br /> FROM: Steve Garman, City Manager <br /> Stephen P. Swanson, P.E., Acting Director of Wat r Management� <br /> John A. Smith, Water Production Manager ` <br /> SUBJECT: South Water Treatment Plant Raw Water Pump Station <br /> SCADA System Installation and Programming <br /> City Project 2000-23 <br /> The Raw Water Pump Station (RWPS) serving the City's South Water Treatment Plant <br /> (SWTP) pumps water from Lake Decatur into the SWTP. This water is treated and then put into <br /> the City's water distribution system. Presently the RWPS controls are connected to the SWTP <br /> through underground wires that enable staff to operate and monitor operations and conditions at <br /> the RWPS. This existing control system needs to be replaced with a radio telemetry system so <br /> the RWPS can be incorporated into the Supervisory Control and Data Acquisition (SCADA) <br /> system being implemented by the City. <br /> The City Council at its June 5, 2000, meeting approved an agreement with PC & E <br /> Consulting Engineers to design the SCADA system and prepare plans and specifications. PC & <br /> E completed the design and prepared the plans and specifications. The project was advertised for <br /> bids and two bids were received and opened on September 21, 2000. The results of the bid <br /> opening (a bid tabulation is attached)were as follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over (-Under� <br /> Engineer's Estimate $65,500.00 --- <br /> Bodine Electric $54,586.00 (-16.66%) <br /> Egizii Electric, Inc. $54,985.00 (-16.05%) <br />