Laserfiche WebLink
h � <br /> Stai�'mg&Cost Submittal Hanson Engineers, Inc. ATTACH M ENT A <br /> Basin 6 Dredging Sediment Storage Site <br /> City of Decatur <br /> September 15, 2000 <br /> Labor Costs Direct Costs Tota1 Costs <br /> � <br /> � �b <br /> � � 5 � � �� � <br /> �� �� .� � > 5 � � � N � � N ; � �, <br /> Task Descriptions � � v� � � u � .� e o " � � � °' <br /> w w ° � H F' H � u � x p � � � � � <br /> w W �" � w <br /> � <br /> 10.0 Phase I Pro er Ac uisition-Exist.Basin <br /> 10.1 Review Existin Site Pro e Information 16 16 $2,320 $2,320 <br /> 10.2 Com ile Pro e Ownershi Data 16 16 $2,320 $2,320 <br /> 10.3 Assess Additional A uisirion Needs 12 12 $1,740 $30 $8 $1,778 <br /> 10.4 Conduct Fair Market Va1ue Studies 32 $2,112 $60 $16 �2,188 <br /> 0 0 0 0 0 0 76 0 44 0 120 $8,492 90 0 24 0 0 0 $8,606 <br /> 114 <br /> 11.0 Phase I Pro ert A uisition-New Sites <br /> 11.1 Com ile Pro e Ownershi Data 3 sites 24 72 $7,272 $60 $16 $7,348 <br /> 11.2 Assess A uisirion Needs 3 sites 36 36 $5,220 $5,220 <br /> 11.3 Conduct Fair Market Value Studies 3 sites 96 $6,336 $?8 $16 $6,430 <br /> 0 0 0 0 0 4 156 0 108 0 264 $18,828 138 0 32 0 0 0 $18,998 <br /> 12.0 Phase I Reclamation Studies <br /> 12.1 Research Previous Reclamation Measures $0 $0 <br /> 12.2 Meet with Area Industries 20 4 4 $2,656 $2,656 <br /> 12.3 Investi ate Sediment Use for Embankment 20 4 4 $2,656 $2,656 <br /> 12.4 Investi ate Sediment Use for Soil Su lement 20 4 $2,256 $2,256 <br /> 12.5 Invesri ate Sediment Use for To soil A lications 20 4 $2,256 $2,256 <br /> 0 80 8 16 0 0 0 0 0 0 104 $9,824 0 0 0 0 0 0 $9,824 <br /> 0 <br /> 13.0 Phase I Feasibilit Re ort <br /> 13.1 Pre are Prelimin Plans& S ecs for Existin Basin 8 2 $954 $954 <br /> 13.2 Pre are Prelimin Plans for Alternate Sites 8 2 $954 $954 <br /> 13.3 Pre are Prelimin Cost Estimates 8 2 $954 $954 <br /> 13.4 Pre are Com arative Environmental Im acts Matrix 16 16 16 6 $3,958 $3,958 <br /> 13.5 Pre are Phase I Studies Re ort $0 $0 <br /> 13.5.1 Draftin of Fi es 4 32 $1,916 $1,916 <br /> 13.5.2 Re ort Pre ararion 24 32 32 4 2 16 8 $9,598 $9,598 <br /> 13.5.3 O erarion and Maintenance Plan 16 4 2 $2,Q22 $2,p22 <br /> 13.5.4 Emer enc Acrion Plan 16 4 2 $2,022 $2,022 <br /> 13.6 Assist Ci with Alternate Site Selection 8 8 $1,496 $1,496 <br /> 40 100 56 18 34 32 0 0 0 18 298 $23,874 0 0 0 0 0 0 $23,874 <br /> 0 <br />