Laserfiche WebLink
` �ta�fing & Cost Submittat SKS ENGINEERS, INC. <br /> Basin 6 Dredging Sediment Storage Site Staffing & Cost Estimate ATTACHMENT A <br /> City of Decatur - <br /> HLC Project No. 4572 - SKS Project No. 07828 <br /> 14-Sep-2000 <br /> Shaffer Krimmel Wright Hancock Skinner Baldwin Mathias Zegler Robinson Etherton <br /> Project Project Sr. Tech Senior Drillers CADD Total Total <br /> Item No. Item Description Mar. Enar. Tech II Driller Drilter Hetper Draftsman A�cc� Clerical Hours Cost <br /> 9 Phase I Engineerin4 Studies�StQra Site Alterna es <br /> 9.1 Literature, Geology& Pedelogy reports 8 8 <br /> Person Hours 8 0 0 0 0 0 0 0 0 8 16 <br /> Personnel Cost 800.00 0.00 0.00 0.00 0.00 0.00 4.00 0.00 0.00 216.00 $1,016 <br /> 12 Ph I Reclamation Studi�s <br /> 12.1 Study for use 16 8 8 8 <br /> Person Hours 16 0 8 8 0 0 0 0 0 8 40 <br /> Personnel Cost 1600.00 0.00 608.00 272.00 0.00 0.00 0.00 0.00 0.00 216.00 $2,696 <br /> 14 C�rdination wlCitv Durina Phase I Study <br /> 14.1 Meetings with Client fi 6 <br /> Person Hours 6 6 0 0 0 0 4 0 0 0 12 <br /> Personnel Cost 600.00 600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1,200 <br /> PHASE I TOTAL ESTIMATED MAN HOURS 580 <br /> PHASE I TOTAL ESTMATED COST $30,072 <br /> 16 Ph 11 Additional Data Gathering <br /> 16.1 Construction Study 8 8 <br /> Person Hours 8 0 8 0 0 0 0 0 0 0 16 <br /> Personnel Cost 800.00 0.00 608.00 0.00 O.OQ 0.00 0.00 0.00 4.00 0.00 $1,408 <br /> 18 Ph II Engineering Calculation.� <br /> 18.1 Support for HEI 8 <br /> Person Hours 8 0 0 0 0 0 0 0 0 0 8 <br /> Personnel Cost 800.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $800 <br />