Laserfiche WebLink
Project............................Decatur Silt Retention Basin Repairs-Phase II ENGINEER'S ESTIMATE Bodine Services,Inc. Universal Mechanical Christy Foltz,Inc. <br /> Ciry Project...................9834 5330 East Firehouse Road 936 E CR 100 N 740 South Main Street ' <br /> City Engineering Division Decatur,Illinois 62521 Hammond,Illinois 61929 Decatur,Illinois 62521 <br /> Bid Date........................ 7'uesday,May 9,2000 � <br /> 5%BID BOND 5%BID BOND 5%BID BOND <br /> Time............................. 2:00 p.m. Apparent Low Bidder <br /> ITEM PAY ITEM UNIT QTY UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> NUMBER PRICE PRICE PRICE PRICE <br /> 60213300 CATCHBASIN,SPECIAL,STRUCNRED EA 1 $I,500.00 $1,500.00 $1,500.00 $1,500.00 $3,800.00 $3,800.00 $1,500.00 $],500.00 <br /> 60213300 CATCHBASIN,SPECIAL,STRUCTUREC EA 1 $I,000.00 $1,000.00 $1,500.00 $1,500.00 $3,800.00 $3,800.00 $1,500.00 $1,500.00 <br /> SSOB0340 STORM SEWER,CLASS B,TYPE 2(12-INCH) FT 1,125 $32.00 $36,000.00 $30.00 $33,750.00 $44.00 $49,500.00 $57.00 $64,125.00 <br /> 602550 ADJUSTSTRUCTUREB EA 1 $1,200.00 $1,200.00 $1,000.00 $1,000.00 $2,800.00 $2,800.00 $2,000.00 $2,000.00 <br /> TOTAL BID As Corrected $39 700.00 $37 750.00 $59,900.00 $69,125.00 <br /> Percent Over or Under ENGINEER'S ESTIMATE 4.91 50.88 74.12 <br /> The Apparent Low Bidder is: Bodine Services,Inc. <br /> q-ZG-6c� <br /> Stephen wanson,P.E.,City Engineer Date <br />