Laserfiche WebLink
{ ' <br /> oF'�Fc <br /> � �n, 9� <br /> JID� C <br /> ���� <br /> �:�:►� <br /> '/[LINO�S� <br /> September 12, 2000 <br /> ENGINEERING & INFRASTRUCTURE MEMORANDUM <br /> No. 2000-11 <br /> Memorandum To: Honorable Mayor and City Council <br /> From: Steve Garman, City Manager <br /> Matthew C. Newell, Acting Director of Engineerin & Infrastructure ��l���� <br /> William A. Ratekin,Acting City Engineer �'� <br /> Kris G. Quandt, E.I.T., Civil Engineer I J C� <br /> � <br /> Subject: East Grove Road Bridge Deck Replacement <br /> City Project 9928 <br /> Structure Number 058-06010, located on East Grove Road, is in need of surface <br /> pavement repair(refer to attached locale map). This need is generally the result of normal <br /> pavement maintenance and repair. <br /> The Engineering Division prepared the plans and specifications for the project. Bids <br /> were received and opened on August 30, 2000. The results (copy of the bid tabulation is ' <br /> attached) of letting are as follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over(-Under� <br /> Engineer's Estimate $ 33,831.00 ------ <br /> Christy-Foltz, Inc. $ 24,903.00 (26.4) <br /> Otto Baum Company, Inc. $ 80,510.00 138.0 <br />