Laserfiche WebLink
I <br /> - � I <br /> OF'�f(' <br /> � �� 9� <br /> V A <br /> - V:1:� <br /> '��LINO�`' <br /> September 12, 2000 <br /> ENGINEERING & INFRASTRUCTURE MEMORANDUM <br /> No. 2000-12 <br /> Memorandum To: Honorable Mayor and City Council <br /> From: Steve Garman, City Manager <br /> Matthew C. Newell, Acting Director of Engineering & Infrastructure"���� <br /> William A. Ratekin, Acting City Engineer <br /> Kris G. Quandt, E.I.T., Civil Engineer I� <br /> Subject: Downtown Crosswalk Repairs <br /> City Project 9918 <br /> Crosswalks located within the Downtown area are in need of replacement(refer to <br /> attached locale map). This need is generally the result of normal maintenance and repair. <br /> The Engineering Division prepared the plans and specifications for the project with <br /> alternates as follows: <br /> Alternate #1 provided plain concrete with a scared j oint pattern <br /> Alternate #2 provided dyed concrete with a scored joint pattern <br /> Alternate #3 provided dyed and stamped concrete � <br /> Bids were received and opened on August 31, 2000. The results (copy of the bid <br /> tabulation is attached) of the letting are as follows: <br />