My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2000-130 AUTHORIZING EXECUTION OF AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2000
>
R2000-130 AUTHORIZING EXECUTION OF AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2016 1:32:25 PM
Creation date
3/30/2016 1:32:03 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2000-130
Res Ord Title
AUTHORIZING EXECUTION OF AGREEMENT U.S. ROUTE 51 (ALT.) AND ASH AVENUE, IN DECATUR, ILLINOIS
Approved Date
7/31/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FAP Route 710 (U.S. Bus. Route 51) <br /> State Section SOR-N <br /> City Section 99-09941-00-SP <br /> Macon County <br /> C-95-066-00 <br /> Agreement No. JN-500008 <br /> Contract No. 70089 <br /> AGREEMENT <br /> This agreement entered into this�t�day of.,$� ���,, � , A.D. 20 C?� , by and <br /> between the STATE OF ILLINOIS, acting by and through its DEPARTMENT OF <br /> TRANSPORTATION hereinafter called the STATE, and the City of Decatur, of the State of <br /> Illinois, hereinafter called the CITY. <br /> WITNESSETH <br /> WHEREAS, the CITY, in order to facilitate the free flow of traffic and insure safety to <br /> the motoring public, is desirous of improving the intersection of Bloomington Road (US Route <br /> 51) with Ash Avenue by widening the Ash Avenue pavement east of US Route 51 to provide <br /> two (2)-12 ft. through eastbound traffic lanes, one 12 ft. through westbound traffic lane, a <br /> variable width striped median, two (2)-12 ft. and variable width westbound left turn lanes, and <br /> one 12 ft. westbound right turn lane; by widening the U.S. Route 51 pavement to provide two <br /> (2)-12 ft. through traffic lanes in both directions, variable width barrier medians, two (2)-12 ft. <br /> and variable width southbound left turn lanes, one 12 ft. southbound right turn lane, one 12 ft. <br /> northbound left turn lane, and one 12 ft. northbound right turn lane; relocate and modernize <br /> traffic signals at the U.S. Route 51 intersection with Ash Avenue; construct curb and gutter <br /> and a storm sewer system for highway drainage and by performing all other work necessary to <br /> complete the improvement in accordance with the approved plans and specifications; and <br /> WHEREAS, the STATE is desirous of said improvement in that same will be of <br /> immediate benefit to the State of Illinois residents and permanent in nature; <br /> -1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.