My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2000-128 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2000
>
R2000-128 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2016 2:10:53 PM
Creation date
3/30/2016 2:10:50 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2000-128
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT ANNUAL SEWER TELEVISING PROGRAM
Approved Date
7/31/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> ' <br /> � PART 1 <br /> TSI RESPONSIBILITIES <br /> � A. PROJECT DESCRIPTION <br /> � The project is described as follows: <br /> The inspection/survey of approximately 60,000 feet of sanitary sewer ranging in size from <br /> � 8"to 96"in diameter. City of Decatur Project No. 2000-19. <br /> B. SCOPE <br /> � Services to be provided for the Project are as follows: <br /> � TELEVISED PIPELINE INSPECTION/SURVEY <br /> 1. A color television camera capable of insertion into 100% humidity conditions will <br /> be used on this project. The camera head is capable of panning 270° and tilting <br /> � 360°and the iris, focus and light source are all remote controlled in order to look <br /> directly at problem areas, as well as up service connections. The camera will be <br /> transported through the lines on a remote controlled transporter at approximately <br /> � 30 feet per minute, stopping at problem areas to insure proper logging of data. <br /> 2. A video tape recorder in VHS format as well as color photos will also be used to <br /> observe and record features and conditions that will assist in the evaluation of <br /> � the data collected and become a part of the final report. <br /> 3. Traffic control and protection for the project shall be in accordance with I.D.O.T. <br /> , Highway Standard 701606.01. Daytime operations are proposed for the work. <br /> MANHOLE INVESTIGATION I, <br /> � 1. A physical/visual investigation of each manhole using all necessary safety I <br /> equipment. The investigation will include all of items 1 through 7 as outlined in <br /> � Section 2, Item 4C of the Request for Proposal, dated May 8, 2000. Including all <br /> necessary dimensions for the purpose of making detailed drawings. <br /> SMOKE TESTING <br /> � 1. Insertion of an inert type smoke bomb of three-minute duration into manholes by <br /> means of a 3000-cfm or larger blower. Logging of data inGuding color photos of <br /> � locations or smoke observed. <br /> � <br /> � <br /> '� 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.