My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2000-94 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2000
>
R2000-94 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2016 4:21:33 PM
Creation date
3/30/2016 4:21:33 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2000-94
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT MOUNDFORD AND WINNETKA STORM SEWER
Approved Date
6/19/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> � � <br /> OF'�EC <br /> ~ 9C <br /> v �o <br /> �:I:� <br /> '�lLINO\Y <br /> June 14, 2000 <br /> PUBLIC WORKS MEMORANDUM <br /> NO. 2000-45 <br /> MEMORANDUM TO: Honorable Mayor and City Council <br /> FROM: Steve Garman, City Manager � v <br /> Bruce McNabb, P.E., Director of Publi orks <br /> Stephen Swanson,P.E., City Enginee <br /> Kris Quandt,E.I.T., Civil Engineer I <br /> SUBJECT: Moundford and Winnetka Storm Sewer <br /> City Project 9910 <br /> The intersection of Moundford Avenue and Winnetka Avenue and properties on the west <br /> side of this intersection experience flooding problems from heavy rainstorms (refer to attached <br /> locale map). At least one home in this area frequently encounters a flooded crawl space. <br /> City staff's review of this matter confirmed the need for drainage improvements to <br /> mitigate the flooding problems. The flooding is generally caused by flat street grades in <br /> Moundford Avenue, and the lack of storm sewer inlets to intercept and drain the storm water <br /> runoff. <br /> The Engineering Division prepared the plans and specifications for the project. Bids <br /> were received and opened on June 8, 2000. The results (copy of the bid tabulation is attached) of <br /> the letting are as follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over(-Under� <br /> Engineer's Estimate $51,605.00 -- - <br /> Burdick Plumbing &Heating, Inc. $40,078.00 (22.3) <br /> Entler Excavating $40,504.00 (21.5) <br />
The URL can be used to link to this page
Your browser does not support the video tag.