_. ,
<br /> Prmject..........:.................Street Reconstruction ENGINEER'S ESTIMATE Dunn Company
<br /> City Project...................2000-24 724 North Mercer Street
<br /> City Engineering Division Decatur,Illinois 62522
<br /> Bid Date........................ Monday,June 12,2000
<br /> 5%BID BOND
<br /> Time..............................2:00 p.m. Apparent Low Bidder
<br /> ITEM PAY ITEM UNIT QTY UNIT TOTAL UNIT TOTAL
<br /> NUMBER PRICE PRICE
<br /> 35100100 INCIDENTAL AGGREGATE SURFACE COURSE 200 TON $24.00 $4,800.00 $23.00 $4,600.00
<br /> 35200300 BASE CONSTRUCTION,CEMENT MODIFIED 55,000 SY $6.65 $365,750.00 $6.55 $360,250.00
<br /> 35200500 CEMENT 27,500 100 WT $5.80 $159,500.00 $5.80 $159,500.00
<br /> 35200601 EXCAVATION,BASE COURSE 55,000 SY $4.30 $236,500.00 $4.20 $231,000.00
<br /> 40600100 BITUMINOUS MATERIALS,RC70/CSS-1H 11,000 GALLON $1.75 $19,250.00 $1.75 $19,250.00
<br /> 40600800 BITUMINOUS CONCRETE SURFACE COURSE, 10,010 TON $55.50 $555,555.00 $54.25 $543,042.50
<br /> CLASSI
<br /> 40800040 INCIDENTAL BITUMINOUS SURFACING- 125 SY $40.00 $5,000.00 $34.00 $4,250.00
<br /> DRIVEWAYS
<br /> 42300700 PCC DRIVEWAY PAVEMENT REMOVE&REPLACE 150 SY $40.00 $6,000.00 $39.60 $5,940.00
<br /> (6-INCH)
<br /> 42400200 PCC SIDEWALK,REMOVE&REPLACE(5-INCH) 700 SF $3.50 $2,450.00 $4.00 $2,800.00
<br /> 56100910 VALVE BOX ADJUSTMENT 115 EA $570.00 $65,550.00 $555.00 $63,825.00
<br /> 56109211 VALVE BOX FRAME AND LID 100 EA $85.00 $8,500.00 $85.00 $8,500.00 I
<br /> 60250600 CATCH BASIN TYPE III,FRAME&GRATE(2-FOOT) 2 EA $2,300.00 $4,600.00 $2,300.00 $4,600.00
<br /> 60255500 MANHOLE ADJUSTMENT 70 EA $780.00 $54,600.00 $770.00 $53,900.00
<br /> 60255501 MANHOLE CONCRETE FLAT TOP(8-INCH THICK) 25 EA $225.00 $5,625.00 $225.00 $5,625.00
<br /> 60255800 MANHOLE FRAME&LID,TYPE 1 CLASS 50 EA $260.00 $13,000.00 $255.00 $12,750.00
<br /> 60604400 COMBINATION CONCRETE CURB&GUTTER, 1,100 LF $18.00 $19,800.00 $22.00 $24,200.00
<br /> TYPE B-6.18
<br /> 60604401 COMBINATION CONCRETE CURB&GUTTER 2,650 LF $20.00 $53,000.00 $22.00 $58,300.00
<br /> REMOVE&REPLACE
<br /> 550A2320 TRUSS PIPE(12-INCH) 50 LF $29.00 $1,450.00 $28.60 $1,430.00
<br /> TOTAL BID As Corrected $1 580 930.00 $1 563 762.50
<br /> Percent Over or Under ENGINEER'S ESTIMATE $1.09
<br /> The Apparent Low Bidder is: Dunn Company
<br /> � �-�3-O�D
<br /> tephen wanson,City Engineer Date
<br />
|