Laserfiche WebLink
' ' Enclosure (1) '� <br /> � ' June11 2000 <br /> Page 2 of 5 <br /> PROJECT PLAN <br /> CITY OF DECATUR <br /> HUBBARD AVENUE/ REA'S BRIDGE ROAD CONNECTOR <br /> 3 FIELD SURVEYS FOR ROADWAY <br /> 3 MAN CREW <br /> .01 Locate Existing Horizontal & Vertical Control <br /> .02 Set Missing Horizontal Control & Cross Street Control <br /> .03 Set 100 Foot Stations <br /> .04 Run Bench Circuit <br /> .05 Acquire Swing Ties to Control Points (14 each) <br /> .06 Acquire Cross Sections & Topo <br /> .07 Inventory Storm 8 Sanitary Drainage Structures <br /> .08 Reduce Notes <br /> 4 UTILITY COORDINATION <br /> .01 Contact Each Utility & Request Existing Records <br /> .02 Receive & Review Utility Data <br /> .03 Plot Utility Information on Utility Map <br />