Laserfiche WebLink
� , Enclosure (1) <br /> June 11, 2000 <br /> Page 4 of 5 <br /> PROJECT PLAN <br /> CITY OF DECATUR <br /> HUBBARD AVENUE/ REA'S BRIDGE ROAD CONNECTOR <br /> 5 LOCATiON STUDY (Continued) <br /> .22 Identify Limits of Each Ownership <br /> .23 Set Proposed ROW Limits (Already Established) <br /> .24 Review with IDOT <br /> .25 Review with Appropriate Local Agencies <br /> 6 INTERSECTION DESIGN STUDIES <br /> .01 Review Traffic Counts <br /> .02 Plot Traffic Movements on Base Sheet <br /> .03 Establish Phasing and Cycle Time <br /> and complete capacity design study <br /> .04 Evaluate Warrants for Signals <br /> .05 Not used <br /> .06 Establish and Calculate Horizontal Alignment <br /> .07 Establish and Calculate Vertical Alignment <br /> .08 Complete Elements Controlling Design and <br /> General Notes on Base Sheet <br /> .09 Draft Intersection Plan on Base Sheet � <br /> .10 Draft Profiles ' <br /> .11 Check IDS and Submit to IDOT <br /> .12 Review Comments & Revise <br /> .13 Submit to Local Agencies <br /> .14 Review Comments & Revise <br />