My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2000-71 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2000
>
R2000-71 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2016 9:56:24 AM
Creation date
3/31/2016 9:56:23 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2000-71
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FIRE DEPARTMENT DRIVEWAY REPLACEMENTS
Approved Date
5/15/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OF'�fC <br /> ~ 9G <br /> v � <br /> '�-!��� <br /> '/lLINO\Y <br /> May 10, 2000 <br /> PUBLIC WORKS MEMORANDUM � <br /> NO. 2000-3 5 <br /> MEMORANDUM TO: Honorable Mayor and City Council <br /> FROM: Steve Garma ty Manager �/ <br /> Bruce A. Mc ab , P.E., Director of Public Works <br /> Stephen Swans ,P.E., City Engineer�� <br /> SUBJECT: Fire Department Driveway Replacements <br /> City Project 9936 <br /> The driveways at four of the City's fire stations are in need of repair. The locations are <br /> Station No. 2 at 2707 East William Street; Station No. 4 at 2760 North 22nd Street; Station No. 5 <br /> at 225 Christine Drive; and Station No. 6 at 1880 Route 51 South (refer to attached locale map). <br /> This need is generally the result of continuous heavy loading and use. <br /> The Engineering Division prepared the plans and specifications for the project. Bids <br /> were received and opened on May 2, 2000. The results (copy of the bid tabulation is attached) of <br /> the letting are as follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over(-Under� <br /> Engineer's Estimate $ 72,180.00 -- - <br /> Otto Baum& Sons $ 65,818.17 (8.81) <br /> Christy-Foltz, Inc. $ 67,680.00 (6.23) <br /> Entler Excavating $ 82,188.00 13.87 <br /> C & D Hard Surfacing $ 143,591.40 98.94 <br /> Funding for this project will come from the General Capital Fund. <br />
The URL can be used to link to this page
Your browser does not support the video tag.