Laserfiche WebLink
Project............................1999 Concrete Sidewalk Replacement Program ENG[NEER'S EST[MATE Kamic Conswcrion Entler Excavating Co.,Inc. Bodine Services,Inc. Christy Foltz,Inc. <br /> City ProjecG_................9922 1089 West Marietta 819 N.Sunnyside Road 5330 East Firehouse Road 740 South Main Street <br /> City Engineering Division Decatuy Illinois 62522 Decatur,Illinois 62522 Decatur,Illinois 62521 Decatur,[Ilinois 62521 <br /> Bid Date........................ Thursday,March 23,2000 <br /> 5%BID BOND 5%BID BOND 5%BID BOND 5%BID BOND <br /> Time.............................. 2:15 p.m. Apparent Low Bidder <br /> [TEM PAY[TEM UNIT QTY UNIT TOTAL ONIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> NUMBER PRICE PRICE PRICE PRICE PRICE <br /> 3510000 AGGREGATE BASE COURSE(CA-6) TON 20 $50.00 $I,000.00 $20.00 $400 00 $22.00 $440.00 $20.00 $400.00 550.00 31,000 00 <br /> 4060001 �N�NOUSCONCRETESIJRFACECOURSE,CLASSI(2- TON 10 $150.00 $I,500.00 $130.00 $1,300.00 $165.00 $t,65000 5100.00 $1,000.00 $22000 $2,20000 <br /> 4240002 �RTLAND CEbfENT CONCRETE ADA RAMP INSTALLED SF 2,000 $830 $I6,600.00 $4J5 59,500 00 $4.75 $9,500 00 $5.00 $10,000.00 $8.50 $t7,000 00 <br /> COMPLETE(5-INCE� <br /> 4240001 �RTLANDCEMENTCONCRETESIDEWALKREMOVAL SF 18,330 $3.50 $64,155.00 $2J0 549,49100 $3.10 $56,823.00 $4.00 $73,320.00 $4.40 $SQ652.00 <br /> AND REPL.P.C[vfENT(5-INCI-n <br /> 4240003 �RTLANDCEMENTCONCRETEDRIVEWAYREMOVAL SY 400 $40.00 $16,000.00 $30.00 $12,000.00 $3750 $I5,000.00 $30.00 $12,000.00 $41.00 $16,400.00 <br /> AND REPLACEMENT(6-INCH) <br /> 5630000 RELOCATEDOMESI7CWATERSERVICEBOX EA 5 $I50.00 $750.00 $130.00 $65000 $260.00 $1,300.00 $I50.00 $75000 $150.00 $75000 <br /> TOTAI,BID AS COrreCted 5100 005.00 $73 341.00 584,713.00 S97,470.00 5118,002.00 <br /> Percent Over or nder ENGINEER'S ESTIMATE 26.66 (1519 2.53 15.00 <br /> 77�e Apparent Low Bidder is: Kamic Consauction <br /> Stephen Swanson,P.E.,City Engineer Date <br />