My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R99-195 REQUESTING FUNDING
COD
>
City Clerk
>
RESOLUTIONS
>
1999
>
R99-195 REQUESTING FUNDING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2016 8:26:30 AM
Creation date
4/7/2016 8:26:29 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R99-195
Res Ord Title
REQUESTING FUNDING FOR PLANNING, ENGINEERING, AND CONSTRUCTION OF THE U.S. ROUTE 51 FOUR (4) LANE CONNECTOR ROADWAY BETWEEN DECATUR AND CENTRALIA
Approved Date
11/1/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. R99-195 <br /> RE50LUTION REQUESTING FUNDING <br /> FOR PLANNING,ENGINEERING,AND CONSTRUCTION <br /> OF THE U.S. ROUTE 51 FOUR(4) LANE CONNECTOR <br /> ROADWAY BETWEEN DECATUR AND CENTRALIA <br /> WHEREAS, the U. S. Route 51 Coalition of Community Leaders seeks funding from the <br /> Illinois Department of Transportation for the planning, engineering, and construction of the 107 <br /> mile connector roadway to link this highway from Northern to Southern Illinois as a four (4) - <br /> Lane Highway; and, <br /> WHEREAS, the existing two (2) - lane U. S. 51 Roadway was engineered in the 1920's <br /> to outdate highway standards that pose safety concerns and impede our local and regional <br /> opportunity for economic and community growth; and, <br /> WHEREAS, engineers at the Illinois Department of Transportation estimate the <br /> completion of U. S. 51 into a four (4) - Lane Highway for the 107 mile connector between <br /> Decatur to Centralia at a cost of$300 million to $385 million; and, <br /> WHEREAS, construction of the U. S. 51 four (4) - Lane Highway Corridor wli enhance <br /> safety, economic development, and quality of life issues in Central and Southern Illinois, and this <br /> transportation improvement activity is complimentary to Governor Ryan's Build Illinois FIRST <br /> (Fund For Infrastructure, Roads, Schools, and Transit) Proposal. <br /> NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF <br /> DECATUR, ILLINOIS: <br /> Section 1. That the City Council of the City of Decatur supports the timely construction <br /> of the 107 mile U. S. 51 Four(4) - Lane Connector Highway from Decatur to Centralia <br /> Section 2. T'hat the City Clerk be, and she is hereby, authorized and directed to forward <br /> a copy of this resolution to Governor George Ryan, Department of Transportation Secretary Kirk <br /> Brown, Senator Duane Noiand, and State Representatives Julie Curry and Bill Mitchell. <br /> PRESENTED and ADOPTED this 1 st day of November, 1999. <br /> ! � <br /> TE . HOWL , YOR <br /> ATTEST:. , <br /> l � �1 <br /> � ' '�! ��C�� <br /> ����� ,_< < <br /> CIT'Y CLE <br />
The URL can be used to link to this page
Your browser does not support the video tag.