My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R99-176 AUTHORIZING THE EXECUTION OF AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
1999
>
R99-176 AUTHORIZING THE EXECUTION OF AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2016 9:45:46 AM
Creation date
4/7/2016 9:45:44 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R99-176
Res Ord Title
AUTHORIZING THE EXECUTION OF AN AGREEMENT FOR ENGINEERING SERVICES FOR NITRATE DESIGN, CITY PROJECT 9953
Approved Date
10/18/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' ADDITIONAL WATERWORKS RELATED SERVICES <br /> Additional services will be provided when requested in writing by Owner. Upon written <br /> request, Engineer agrees to develop appropriate scope of services for consideration by <br /> Owner. Engineer understands that the request by Owner does not obligate Owner to <br /> proceed or otherwise utilize Engineer to provide the services requested. These <br /> services will be added by amendment to this Agreement. <br /> SUPPLEMENTAL SERVICES <br /> A. Any work requested by Owner that is not included in one of the items listed in <br /> any other task will be classified as supplemental services. Work determined to 1�8 <br /> supplemental services will proceed only after Owner has authorized Engineer in <br /> writing to proceed. <br /> B. Supplemental services shall include, but are not limited to: <br /> 1. Additional meetings with local, State, or Federal agencies to discuss the <br /> project. <br /> 2. Appearances at public hearings or before special boards. <br /> 3. Supplemental engineering work required to meet the requirements of <br /> regulatory or funding agencies that become effective subsequent to the <br /> date of this agreement. <br /> 4. Special consultants or independent professional associates requested or <br /> authorized by Owner. <br /> 5. Assistance with bid protests and rebidding. The cost of this assistance <br /> shall be the responsibility of the Owner unless the Engineer is determined <br /> to be at fault. <br /> 6. Preparation for litigation, arbitration, or other legal or administrative <br /> proceedings; and appearances in court or at arbitration sessions, in <br /> connection with bid protests, change orders, or construction incidents. <br /> 7. Services for making revision� to drawings and specifications made <br /> necessary by the acceptance of substitutions proposed by the Contractor; <br /> and services after the award of contract for evaluating and determining the <br /> acceptability of substitutions proposed by the Contractor. <br /> 09/30/99 A-7 <br /> CofDAttachA <br /> slwt as <br />
The URL can be used to link to this page
Your browser does not support the video tag.