Illinois Departrn�t ' Municipai Estimate of
<br /> of Transportation Maintenance Costs
<br /> Period from January 1, 1942,to December3l, 19.42_MunioipalityDecatitr
<br /> Estimated Cost of Maintenance Operations
<br /> Material,Equipment or Labor Operation
<br /> Maintenance Operation Quantity Unit Amount Cost
<br /> (No.-Description-Total Duantity) Item and Specification Reference and Unit Cost
<br /> Milling and Rehabilitation Cold-Milling 235,248 SY $1.60 $376,397.00 $2,083,770.00
<br /> Bit.Conc.Surf.Cse.CI I,Mix D,Ty.2 3,830 TON $46.50 $178,095.00
<br /> Bit.Conc.Surf.Cse.CI I,Mix C,Ty.2 19,700 TON $44.00 $866,800.00
<br /> Level Binder 2,500 TON $44.00 $110,000.00
<br /> Reflective Crack Control 158,950 SY $0.80 $127,160.00
<br /> Bituminous Materials(CSS-1H,RG70) 15,250 GAL $1.12 $17,080.00
<br /> Bituminous Materials(AC-20) 47,700 GAL $0.75 $35,775.00
<br /> Prime Coat Aggregate 250 TON $9.95 $2,488.00
<br /> Mixture for Cracks 30 TON $160.00 $4,800.00
<br /> Pavement Removal-Butt Joints 2,100 SY $9.50 $19,950.00
<br /> . Manhole Frame&Lid 15 EA $475.00 $7,125.00
<br /> Valve Box Adjusted with New Casting 25 EA $325.00 $8,125.00
<br /> Manhole Adjusted 25 EA $170.00 $4,250.00
<br /> Valve Box Adjusted 85 EA $175.00 $14,875.00
<br /> Valve Box Milling 140 EA $150.00 $21,000.00
<br /> Manhole/Catch Basin Milling 275 EA $150.00 $41,250.00
<br /> Rem./Rep.Comb.C.&G.B-6:12/6-6:18 12,000 LF $18.65 $223,800.00
<br /> Rem./Rep.Comb.C.&G.M-6:18 1,000 LF $18.65 $18,650.00
<br /> Temporary Striping 600 LF $0.25 $150.00
<br /> Traffic Signal Loop 400 LF $15.00 $6,000.00
<br /> Traffic Signal Maintenance $298,600.00
<br /> Misc.Traffic Signal Modifications $15,000.00
<br /> Macon Cnty Joint MFT Work w/City �300,000.00
<br /> City's non-MFT Contribution ($33,770.00)
<br /> Total Estimated Maintenance Cost 52,663,600.00
<br /> G>�
<br /> Submitte �'c 21 , 19�� Approved � , 1 g°�
<br /> G I'\/ G�11`�
<br /> Munic� ic�a ' le District Engineer