Laserfiche WebLink
Of'�fC <br /> ~ 9C <br /> V 7e <br /> '�[ll� <br /> March 22, 1999 <br /> PUBLIC WORKS MEMORANDUM <br /> NO. 99-05 <br /> MEMORANDUM TO: Honorable Mayor and City Council <br /> FROM: James L. Williams, Jr., City Manager � 'q�� � -�`� <br /> Bruce A. McNabb, P.E., Director of Public Work��� � <br /> Matthew C. Newell, P.E., Traffic EngineerG%�2�� <br /> SUBJECT: City Project 9825 <br /> Curb Reconstruction - 600 East Wood Street- 600 East William <br /> Street <br /> An item on the agenda for the March 29, 1999 City Council meeting is the acceptance of <br /> bids and award of a contract to perform Curb Reconstruction at 600 East Wood Street and 600 <br /> East William Street. <br /> This work will create a smooth transition to the existing offset curbing in the 600 block of <br /> East Wood Street. Additional work will remove and replace deteriorated sections of curb and <br /> gutter in the 600 block of East William Street. <br /> The project plans and specifications were prepared by the Traffic Engineer. The project <br /> was advertised and bids were opened on March 16, 1999. The results of the letting are as <br /> follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over(-Under� <br /> Engineer's Estimate $ 38,145.20 --- <br /> Christy-Foltz, Inc. 35,443.00 (7.08%) <br /> W. E. Excavating, Inc. 35,766.80 (6.24%) <br />