Laserfiche WebLink
� ENCLOSURE (1) <br /> � BLANK, WESSELINK, COOK BWC #98-61(1) <br /> � AND ASSOCIATES, INC. October21, 1998 <br /> �, � �, �� ' � Page6of6 ■■ <br /> F . : Id - F = . ■ ■ <br /> Albany / Fulton Storm Drainage Improvements <br /> PROJECT REQUIREMENTS <br /> (Continued) <br /> E. PROJECT PLAN — PHASE III— Services During Construction <br /> (Subject fo the Direction of the City of Decatur) <br /> 1. PRODUCT— FIELD NOTES <br /> ACTIVITIES: <br /> 1.1 Set proposed centerline stakes. <br /> 1.2 Set offset stakes at structures and 100' upstream and downstream of <br /> manholes. <br /> 2. PRODUCT—CONSTRUCTION DOCUMENTATION <br /> ACTIVITIES: <br /> 2.1 Conduct construction observation. <br /> 2.2 Process bulletins and change orders. <br /> 2.3 PerForm final inspection and punch list. <br /> 3. PRODUCT— FIELD NOTES <br /> ACTIVITIES: <br /> 3.1 Perform as-built survey. <br /> 3.2 Reduce notes. <br /> 3.3 Prepare as-built drawings. <br /> 3.4 Submit to City. <br />