<br /> Project.....................................Milling end RehabiGtation ENGINEER'S ESTIMATE Dunn Company MerrilPs Contractors,Inc. Illinois Valley Paviny Compan
<br /> City Project..............................9808 724 North Mercer 1900 East Truman Road PO Box 648 .
<br /> City Engineering Division pecatur,Illinois 62522 Sprinyfield,Illinas 62703 Decatur,Illirwis 62525 � ,
<br /> Bid Date...................................August 24,1998
<br /> Time..........................................2:00 p.m 5%BID BOND 5%BIO BOND 5%BID BOND
<br /> Apparent Low Bidder
<br /> PAY iJNIT QTY UrTIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL
<br /> ITEM PRICE PRICE PRICE PRICE
<br /> BITUMINOUS SURFACE REMOVAL SY 195,350 51.77 5345,769.50 S1.52 5296,932.00 S1.39 S310,606.50 51.63 5318,420.50
<br /> BTf.CONCRETE SURFACE COURSE/CL I,MIX D, TON 12,100 $45.00 $544,500.00 543.50 S526,350.00 544.48 $538,208.00 547.50 $574,750.00
<br /> TYPE 2
<br /> BTT.CONCRET'E SURFACE COURSE/CL I,MD{C, TON 10,800 545.00 5486,000.00 $41.00 5442,800.00 544.09 5476,172.00 $46.00 5496,800.00
<br /> TYPE 2
<br /> BTf.CONCRETE SURFACE COURSE/CL I,MIX E, TON 300 565.00 S19,500.00 554.00 516,200.00 562.50 518,750.00 $54.00 $16,200.00
<br /> TYPE i
<br /> LEVELiNG BINDER(MACHINE METHOD) TON 3,000 545.00 5135,000.00 542.00 5126,000.00 543.23 S129,690.00 546.00 S138,000.00
<br /> AREA REFLECTIVE CRACK CONfROL SY 186,810 $1.09 5203,622.90 50.70 S130,767.00 50.69 S128,898.90 $0.90 $168,129.00
<br /> TREA1'MENT/SYSTEM A
<br /> BTTUMIIJOUS MA1'ERIALS(CSS-1H,RC-70) GAL 6,200 $1.30 $8,060.00 $1.05 56,510.00 51.36 $8,432.00 50.95 S5,890.00
<br /> BTI'IJMINOUS MA1'ERIAI,S(PRIME COAT) GAL 56,045 51.56 587,430.20 $0.70 539,?31.50 50.83 546,517.35 50.85 547,638.25
<br /> AGGREGATE(PRIME COAT) TON 260 S14.00 $3,640.00 $9.50 52,470.00 S14.91 53,876.60 $13.00 53,380.00
<br /> MI}C1'URE FOR CRACKS,JOIN1'S 8c F'LANGEWAYS TON 20 S155.00 S3,100.00 S150.00 53,000.00 5106.49 S2,129.80 S150.00 $3,000.00
<br /> BI1'CJMINOUS SURFACE REMOVAI.-BUTT JOINI' SY 1,000 58.85 58,850.00 59.00 59,000.(b S7.64 S7,640.00 58.75 58,750.00
<br /> MAA1f30LES TO BE ADNSTED W/1VEW FRAME& EA 25 5400.00 $10,000.00 5450.00 511,230.00 S507.63 SI2,690.75 5460.00 SI1,500.00
<br /> GRATE OR LID
<br /> VALVE BOXES TO BE ADNSTED W/NEW EA 70 $115.00 $8,050.00 $300.00 521,000.00 5272.96 $19,10'1.20 $375.00 $26,230.00
<br /> CASTINGS
<br /> FRAMES AND LIDS TO BE ADNSTED EA 75 $175.00 $13,125.00 $160.00 $12,000.00 5210.11 $15,758.25 $125.00 $9,373.00
<br /> VALVE BOXES TO BE ADNSTED EA 20 5385.00 $7,700.00 $103.00 S2,100.00 S148.68 $2,973.60 $150.00 53,000.00
<br /> VALVE BOX MII,LING EA 120 $150.00 $18,000.00 $55.00 56,600.00 S108.97 $13,076.40 $140.00 $16,800.00
<br /> MANHOLE/CATCI-I BASIN MII.LING EA 250 $160.00 540,000.00 $SS.00 $13,750.00 $113.38 $28,345.00 $150.00 $37,500.00
<br /> REMOVAL/REPLACEMEN'T OF COMBINATION LF 200 $25.00 $5,000.00 $18.65 53,730.00 $33.31 56,662.00 $18.00 53,600.00
<br /> CONCRETE CURB 8c GUTTER,B-6:12
<br /> REMVOALJREPLACEMENT OF COMBINATION � 2pp $25.00 $5,000.00 518.65 53,730.00 534.35 $6,870.00 $19.50 53,900.00
<br /> CONCRETE CURB&GUTTER,M-6:18
<br /> REMOVAL/REPLACEMENT OF COMBINATION � bpp $25.00 $15,000.00 $18.65 511,190.00 534.23 $20,538.00 $21.00 $12,600.00
<br /> CONCRETE CURB 8c GLTI"IER,B-6:18
<br /> 1'Er�ORARY PAVEMENf MARKING-6" LF 600 50.50 $300.00 50.25 5150.00 S1.22 5732.00 51.30 5780.00
<br /> TOTAL BID(AS CORRECT'ED) 51,967,647.60 51,684,760.50 51,797,674.35 51,906,262.75
<br /> Percent Over or(Under)ENGINEER'S ESTIMAI'E (14.38 (8.64 (3.12
<br /> The Apparent Low Bidder is: Dunn Company
<br /> Stephen P.Swanson,City Engineer Date '
<br /> I
<br />
|