My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R98-96 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1998
>
R98-96 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 9:43:04 AM
Creation date
4/12/2016 9:43:03 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R98-96
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT STREET RECONSTRUCTION CITY PROJECT 9824
Approved Date
8/3/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project............................Street Reconstnaction ENGINEER'S ESTIMATE DUNN COMPANY ' <br /> Ciry Project.....................9824 724 N. Mercer St. <br /> City Engineering Division Decatur, Illinois 62522 <br /> Bid Date.........................July 23, 1998 <br /> Time................................2:45 p.m. 5% BID BOND <br /> Apparent Low Bidder <br /> PAY ITEM UNIT QTY UNIT TOTAL UNIT TOTAL <br /> PRICE PRICE <br /> Incidental CA6 TON 50 $24.00 $1,200.00 $23.00 $1,150.00 <br /> Base Constructioq Cement M�ed SY 25,706 $6.35 $163,233.10 $6.35 $163,233.10 <br /> Cement 100 WT 11,800 $5.50 $64,900.00 $5.40 $63,720.00 <br /> Excavatio Base SY 25 706 $4.20 $107,965.20 $4.20 $107,965.20 <br /> n, Course , <br /> Bituminous Materials,RC70/CSS-1H(Prime Coat) GAL 7,712 $1.80 $13,881.60 $1.50 511,568.00 <br /> Bituminous Concrete Surface Course,Class I TON 4,319 $52.00 $224,588.00 $50.75 $219,189.25 <br /> Incidental Bituminous Patching TON 20 $156.00 $3,120.00 $75.00 $1,500.00 <br /> PCC Driveway Removal&Replacement(6-Inch) SY 70 $35.00 $2,450.00 $39.60 $2,772.00 <br /> Valve Box Ad�ustment EA 4 $546.00 $2,184.00 $525.00 $2,100.00 <br /> Valve Box Frame and Lid EA 6 $72.80 $436.80 $75.00 $450.00 <br /> Manhole Adjustment EA 18 $430.00 $7,740.00 $735.00 $13,230.00 <br /> Manhole Concrete Flat Top(8-Inch)Thick EA 5 $210.00 $1,050.00 $200.00 $1,000.00 <br /> Manhole Frame and Lid,Type 1,CL EA 4 $230.00 $920.00 $240.00 $960.00 <br /> Combination Curb&Gutter Removal and Replacement (B- LF 100 $20.50 $2,050.00 $22.00 $2>200.00 <br /> 6:18) <br /> TOTAL BID AS CORRECTED $595,718.70 $591,037.55 <br /> Percent Over or Under ENGINEER'S ESTIMATE 0.79 <br /> The Apparent Low Bidder is: Dunn Company <br /> Stephen P. Swanson,City Engineer Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.