My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R98-96 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1998
>
R98-96 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 9:43:04 AM
Creation date
4/12/2016 9:43:03 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R98-96
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT STREET RECONSTRUCTION CITY PROJECT 9824
Approved Date
8/3/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � <br /> . . <br /> Page 2 <br /> The reconstruction process involves removing existing material, constructing a soil-cement <br /> base and placing a new asphalt concrete surface. The finished surface of the new pavement is <br /> approximately 4 inches below its original grade for curbed streets. The finished surface for <br /> non-curbed streets will vary from 0 to 4 inches above the existing street surface. The <br /> reconstruction process does inconvenience residents and disrupt local traffic. This work is <br /> essentially building a new street and the street must be closed to all traffic for up to a week to ten <br /> days. Residents will be inconvenienced and will not have direct access to their driveways while <br /> the street is closed. Staff will be working with the contractor to keep residents and emergency <br /> services informed of the project's progress and to make arrangements for residents having special <br /> needs. The closures will be held to a minimum, but will be unavoidable. It is expected that <br /> complaints from affected residents will occur. <br /> The project specifications were prepared by the Engineering Division. The project was <br /> advertised and bids were received and opened on July 23, 1998. The results of the letting are as <br /> follows: <br /> Compared to <br /> Engineer's Est. <br /> Bid r Bid Price Over(-Under� <br /> Engineer's Estimate $ 595,718.70 --- <br /> Dunn Company $ 591,037.55 (0.79) <br /> The receipt of one bid is a concern to staff as it relates to the City obtaining competitive bids <br /> for its work. However, in this instance the receipt of one bid is considered acceptable given the <br /> historic number of contractors submitting bids for street reconstruction work in the City of <br /> Decatur and the desire to proceed with this project for the general benefit of the public. The <br /> bidder has done this work for the last two years to the satisfaction of staff and residents. <br /> Funding for this project will be from the City's Capital Improvements Fund. <br /> It is recommended by staff that the City Council approve the attached resolution awarding <br /> the contract for the Street Reconstruction, City Project 9824, to Dunn Company, at their low bid <br /> price of$591,037.55 and that the Mayor be authorized to execute the contract. <br /> City staffwill be available to answer questions that the Council may have at the meeting. <br /> attch: 3 <br /> cc: Phillip R. Wilhelm, Municipal Services Manager <br /> William A. Ratekin, Asst. City Engineer <br /> Jim Schwarz, Dunn Company <br />� CP 9824 <br />
The URL can be used to link to this page
Your browser does not support the video tag.