Laserfiche WebLink
6. The City will assume, at it's expense, all cost to repair or replace all parts and II <br /> components nonnally consumed in day-to-day operations such as: tires, tubes, tire repairs, <br /> lubricating oil, filters of all types; grease, fuel, anti-freeze, batteries, headlights, glass breakage, ,s <br /> �� <br /> wire rope, belts, brake linin s, cleaning and painting. ]et rodder hs�se, suction hose r`�— <br /> and pipe, valves, e�ectrical parts, clamps , gaskets, nozzles , repair <br /> f i t t i r�g s, �e'shall have a parts availability policy to supply the City with new parts within <br /> 48 liours (excluding Saturday, Sunday and holidays) or will furnish the parts upon request at no <br /> `cost. Parts covered in this guarantee are those new parts required for normal repairs and <br /> maintenance necessary to keep the machine operating in a day-to-day operation. <br /> 8. The City will maintain equipment in accordance with normal published <br /> manufacturer's recommendations. <br /> 9. Coe has the right to inspect equipment during normal working hours at the City <br /> and inake recominendations for repairs, improved maintenance, etc., in keeping with the <br /> requireinents stated by the manufacturer in the shop manual for the maintenance and repair of the <br /> piece of equipment. <br /> 10. Coe will be fully responsible for the total cost of all repairs (other than in ' <br /> Paragraph 6) to the equipment on the following Power Train items, in excess of the guaranteed ', <br /> maximum cost of repairs (as indicated Exhibit A) for the time of operation in hours, or period of ' <br /> time in years, from the date�of�ielivery, whichever comes first (as indicated on the Exhibit A). '�(/ ' <br /> �.. <br /> Engine, debris bod�,' water tank . vacuum system, high pressure water �� , <br /> pump, front hose reel , hydraulic system, recirculation system and I <br /> fluid coupling. �� <br />