Laserfiche WebLink
� � [GI <br /> cost of$9,000.00. This cost recognizes a credit of$8,000.00 budgeted for temporary <br /> flow measurement devices as part of the 30 day test. If you have a preference, we could <br /> furnish another brand of equal cost. <br /> 3). We will have a Layne field person on the site at all times during the pumping test. <br /> 4). The 30 day test is desigr�ed to operate at or near the pumping rate of the well field '� <br /> during the last extended pumping period in November of 1996. We believe that all ��, <br /> legitimate complaints of well problems were resolved at that time. As a result, we hope <br /> that interference with existing wells will be minimal. As a result, our costs for the 30 day <br /> test do not include emergency pump work for private wells. <br /> 5). T'he digitai data lc,ggers we plan to use have a low water level alarm feature. We will <br /> set the trigger value to allow a safe maxgin of water over the pumps. In addition, we plan <br /> to manually check the pump�ng level and flow meter readings of each well approximately <br /> every t�v�hours during the puanping test. We believe that the combination of these two <br /> measures will prevent tne piu�iping level or pumping rate from dropping too lo�%in any <br /> well, <br /> tiV�trust �his provides the ?nfonmatiari you need. Please feel free to contact me if you <br /> have any additianal c�uestions. <br /> Yours truly, <br /> ,, <br /> '� .� ; <br /> � y,,�,a� <br /> ,JU�r.Jansen, �.Cl., Ph.D. <br /> C�,zef C:=eoS�ientist <br /> Accepted: <br /> erry , or <br /> Date: March , 8 <br /> � �. � , �� � <br /> ATTEST: �iCC..., , (/��i/L�(j <br /> Celeste F. Harris, it Clerk <br />