My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R98-39 AUTHORIZING THE AMENDMENT OF AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
1998
>
R98-39 AUTHORIZING THE AMENDMENT OF AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 1:05:45 PM
Creation date
4/12/2016 1:05:45 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R98-39
Res Ord Title
AUTHORIZING THE AMENDMENT OF AN AGREEMENT DEWITT COUNTY AND CISCO WELL FIELD STUDY CITY PROJECT 9717
Approved Date
3/30/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � [GI <br /> cost of$9,000.00. This cost recognizes a credit of$8,000.00 budgeted for temporary <br /> flow measurement devices as part of the 30 day test. If you have a preference, we could <br /> furnish another brand of equal cost. <br /> 3). We will have a Layne field person on the site at all times during the pumping test. <br /> 4). The 30 day test is desigr�ed to operate at or near the pumping rate of the well field '� <br /> during the last extended pumping period in November of 1996. We believe that all ��, <br /> legitimate complaints of well problems were resolved at that time. As a result, we hope <br /> that interference with existing wells will be minimal. As a result, our costs for the 30 day <br /> test do not include emergency pump work for private wells. <br /> 5). T'he digitai data lc,ggers we plan to use have a low water level alarm feature. We will <br /> set the trigger value to allow a safe maxgin of water over the pumps. In addition, we plan <br /> to manually check the pump�ng level and flow meter readings of each well approximately <br /> every t�v�hours during the puanping test. We believe that the combination of these two <br /> measures will prevent tne piu�iping level or pumping rate from dropping too lo�%in any <br /> well, <br /> tiV�trust �his provides the ?nfonmatiari you need. Please feel free to contact me if you <br /> have any additianal c�uestions. <br /> Yours truly, <br /> ,, <br /> '� .� ; <br /> � y,,�,a� <br /> ,JU�r.Jansen, �.Cl., Ph.D. <br /> C�,zef C:=eoS�ientist <br /> Accepted: <br /> erry , or <br /> Date: March , 8 <br /> � �. � , �� � <br /> ATTEST: �iCC..., , (/��i/L�(j <br /> Celeste F. Harris, it Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.