My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R98-35 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1998
>
R98-35 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 1:11:44 PM
Creation date
4/12/2016 1:11:44 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R98-35
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT EAST PRAIRIE STREET SEWER REHABILITATION CITY PROJECT 9636
Approved Date
3/16/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. _ . <br /> �, <br /> ' Page 2 <br /> and inverts. At locations in the pipes the reinforcing wire mesh is exposed; holes were found <br /> extending through the pipe; cavities were noted around lateral connections and behind the holes; <br /> debris was found in the pipe; and there is a buildup of minerals on the interior of the pipe. <br /> The project plans and specifications were prepared by the Engineering Division. The project <br /> was advertised and bids were received and opened on March 5, 1998. The results of the letting (a <br /> bid tabulation is attached) are as follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over(-Under� <br /> Engineer's Estimate $ 785,550.00 --- <br /> Parkway Construction& Assoc. Inc. $ 639,290.00 (18.62) <br /> Hall Contracting Corporation $ 776,260.00 (1.18) <br /> Pressure Concrete, Inc. $ 899,075.00 14.45 <br /> Parkway Construction is the contractor that satisfactorily completed the recent rehabilitation <br /> of the Lower Broadway Sewer. The funds for this project will be from the General Capital Fund. <br /> It is recommended by staff that the City Council approve the attached resolution awarding <br /> the contract for the East Prairie Street Sewer Rehabilitation Project, City Project 9636, to <br /> Parkway Construction & Associates, Inc., as the lowest responsive, responsible bidder for their <br /> bid amount of$639,290.00, and that the Mayor be authorized to execute the contract. <br /> City staff will be available to answer any questions that the Council may have at the meeting. <br /> attach.: 3 <br /> cc: Phillip R. Wilhelm, Municipal Services Manager <br /> Gene Henry, Sanitary District of Decatur <br /> Parkway Construction& Assoc., Inc. <br /> Hall Contracting Corporation ' <br /> Pressure Concrete, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.