Laserfiche WebLink
Project............................Hyde Park Sanitary Sewer Extension <br /> City Project 9729 Bodine Services, Inc. Sewer Inc. Burdick Plumbing � <br /> Engineer's Estimate 5330 E. Firehouse Road P.O. Box 4569 P.O. Box 496 , <br /> Decatur, IL 62521 Decatur, IL 62525 Decatur,IL 62525 <br /> Bid Date...........................January 8, 1998 City of Decatur <br /> Engineering Division <br /> Time............................... 1:30 P.M. <br /> 5%Bid Bond S•h Bid Bond S°/.Bid Bond <br /> PAY ITEM UNIT QN UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> PRICE PRICE PRICE PRICE <br /> anrtary ewer � to eep . . . . 12, . . 1 , 4 .00 . 0,672. . 1 , . <br /> San'rtary Sewer 8",12'to ZO'Deep' LF. 588.0 a45.00 $26,460.00 550.00 $29,400.00 354.00 331,752.00 b56.00 334,104.00 <br /> Manhole 4'Diameter, Type 1 Frame and <br /> Lid(closed)0'to 12'Deep EA 2.0 31,500.00 $3,000.00 $1,300.00 $2,600.00 31,500.00 33,000.00 52,460.00 $4,920.00 <br /> Manhole 4'Diameter, Type 1 Frame and <br /> Lid(closed)12'to 20'Deep EA 2.0 51,700.00 $3,400.00 E2,200.00 $4,400.00 32,100.00 34,200.00 33,400.00 b6,800.00 <br /> Drop Manhole Connection Encased in Concrete EA 1.0 31,600.00 $1,600•00 $1,450.00 $1,450.00 a1,500•00 31,500.00 E1,740.00 31,740•00 <br /> � <br /> TOTAL BID AS CORRECTED 47,340.00 49,994.00 51,124.00 60 444•00 <br /> Percent Over or(Under)ENGINEE 'S ES IM 5. 1 2 •� <br />