My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R98-05 AUTHORIZING THE EXECUTION OF AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
1998
>
R98-05 AUTHORIZING THE EXECUTION OF AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 2:26:19 PM
Creation date
4/12/2016 2:26:18 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R98-05
Res Ord Title
AUTHORIZING THE EXECUTION OF AN AGREEMENT FOR ENGINEERING SERVICES FOR SOUTH WATER TREATMENT PLANT INTAKE STUDY CITY PROJECT 9732
Approved Date
1/5/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Computer time charges including program use charges. ' <br /> 7. Rental or lease charges for use of equipment, including equipment owned by <br /> the Engineer. <br /> 8. Cost of acquiring any other materials or services specifically for and <br /> applicable to only this project. <br /> 9. Subcontract costs including those for soils and geotechnical investigations and <br /> reports, hydrogeological investigations testing laboratory services, surveying <br /> and mapping services, other subcontract services. <br /> 10. Plotting of drawings <br /> 11. Cost of materials consumed specifically for this project. <br /> B. Engineer agrees to use its best efforts to perform the services within the billing <br /> limits stated aUove and in accordance with the agreed upon performance schedules. <br /> If, at any time, Engineer has reason to believe that the cost of the services will be <br /> greater. Engineer shall promptly notify OWNER to that effect, giving a revised <br /> billing limit for performance of the additional services. <br /> OWNER will not be obligated to reimburse Engineer for costs incurred in excess of <br /> the billing limits specified above, nor shall Engineer be obligated to continue <br /> performance under t}iis Agreement or otherwise incur costs in excess of that amount, <br /> unless and until OWNER notifies Engineer in writing that the billing limits have <br /> been increased to cover the addditional services, and has specified in such notice <br /> revised billing limits for the services in question. When and to the extent that the <br /> billing limits have been increased, any costs incurred by Engineer, in excess of the <br /> billing limits prior to their increase shall be allowable to the same extent as if such <br /> costs had been incurred after the increase in the billing limits was approved. <br /> C. Monthly payments shall be made to Engineer by OWNER based on Engineer's <br /> statement. The statement shall be itemized to indicate the amount of work <br /> performed and the associated reimbursable expenses and subcontract costs. <br /> D. The entire amount of each statement shall be due and payable upon receipt by <br /> OWNER. Carrying charges of 1-1/2 percent per month from the Uilling date, shall <br /> � be due for accounts which are not paid within 60 days after the billing date. <br /> SLW16:069 B_2 December 15, 1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.