Laserfiche WebLink
PART III �� <br /> COMPENSATION, BILLING AND PAYMENT '� <br /> Client shall pay TSI for the Services in accordance with the following: ' <br /> Compensation for the Services will be as stated below. TSI will bill the Client no less <br /> frequently than monthly,with net payment due in 30 days. <br /> The bill will consist of a calculation of the amount of lump sum due based on percentage <br /> of Project completed during the billing period. <br /> Two copies of the final T.V. Inspection Report and one copy of the video tape will be <br /> provided and included in the stated prices. Any additional tapes and reports will be <br /> provided at a cost of$20.00 per each. <br /> We do not anticipate the need for cleaning of the sewer lines prior to televising. <br /> However, in the event that this service is needed, we will provide at a cost of <br /> $150.00/Hr. using a Jet Vactor, plus water and dumping fees. <br /> uanti Unit Cost Cost <br /> Japer St.Sewer <br /> T.V. Inspection 5840 L.F. $1.05 $6,132.00 <br /> Manhole Study 12 Ea. $290.00 $3,480.00 <br /> 6 Ea. $485.00 $2,910.00 <br /> Southeast Interceator <br /> T.V. Inspection 5000 L.F. $1.05 $5,250.00 <br /> Manhole Study 8 Ea. $290.00 $2,320.00 <br /> 5 Ea. $485.00 $2,425.00 <br /> Traffic Control 10 Days $162.00 $1,620.00 <br /> Estimate <br /> TOTAL $24,137.00 <br /> NOTE: <br /> 1. These costs are based on depth of manholes being over 40 feet, creating a <br /> higher degree of difficulty and safety requirements. <br /> 2. Traffic control will be charged only for the number of days on site. <br /> 5 <br />