My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R97-167 AUTHORIZING AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
1997
>
R97-167 AUTHORIZING AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2016 2:43:08 PM
Creation date
4/12/2016 3:35:13 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R97-167
Res Ord Title
AUTHORIZING AGREEMENT WITH ILLINOIS DEPARTMENT OF TRANSPORTATION FOR RECONSTRUCTION OF ROUTE 36 BETWEEN OAKLAND AVENUE AND MOFFET LANE AND JURISDICTIONAL TRANSFERS
Approved Date
12/1/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,y'' •'�. <br /> r g. U_S ROUTE 36: �8 4 meters�q3 3ft ) �=�est of West Eldorado Street to Oakland <br /> . Avenue: <br /> Reconstructing the intersection with West Eldorado Street, including the removal of <br /> concrete medians and concrete traffic islands; coldmilling the existing two (2) through <br /> traffic lanes, in each direction, and turn lanes 50 millimeters (2 in.) in depth; <br /> resurfacing the pavement with 60 millimeters (2'/a in.) of bituminous concrete; <br /> modernizing the traffic signals at West Eldorado Street including posts, signal heads, <br /> combination mast arms including highway lighting requested by the CITY, detector <br /> loops, post mounted signals, controller, and controller cabinet; striping the pavement <br /> with thermoplastic markings, including raised reflective pavement markers, and by <br /> performing all other work necessary to complete this portion of the improvement. <br /> C, VV�ST EL.DORADO STREET (FAU 74041_ U S Ro�te 36 to Fairview venue: <br /> Coldmilling the existing pavement 32 millimeters (1'/a in.), resurfacing the existing <br /> through tra�c lanes with 38 millimeters (1'fz in.) bituminous concrete; modernizing <br /> traffic signals at the intersection with Fairview Avenue (east leg only), including <br /> installing a tra�c signal post, mast arm, signal heads, loop detectors and pedestrian <br /> crossing system; constructing 1.5 meters (5 ft.) PCC sidewalk, as requested by the <br /> CITY; striping the pavement with thermoplastic pavement markings, including raised <br /> reflective pavement markers and by performing all other work necessary to complete <br /> this portion of the improvement <br /> WHEREAS, the CITY is desirous of said improvement in that same will be of immediate <br /> benefit to the CITY residents and permanent in nature; <br /> NOW, THEREFORE, in consideration of the mutual covenants contained herein. the parties hereto <br /> agree as follows: <br /> 1. The STATE agrees to make the surveys, obtain all necessary rights of way, prepare plans and <br /> specifications, receive bids and award the contract, furnish engineering inspection during <br /> construction and cause the improvement to be built in accordance with the plans, specifications <br /> and contract. <br /> 2. The STATE agrees to pay all rights-of-way, construction and engineering costs, including the <br /> costs of railroad adjustments, subject to reimbursement by the CITY as hereinafter stipulated. <br /> I . . . . .. . � � � <br /> 2 II <br />
The URL can be used to link to this page
Your browser does not support the video tag.