My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R97-149 ACCEPTING THE PROPOSAL AND AUTHORIZING AN AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
1997
>
R97-149 ACCEPTING THE PROPOSAL AND AUTHORIZING AN AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2016 4:38:32 PM
Creation date
4/12/2016 4:38:32 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R97-149
Res Ord Title
ACCEPTING THE PROPOSAL AND AUTHORIZING THE EXECUTION OF AN AGREEMENT LIGHTING UPGRADE - PARKING GARAGE C, LOWER LEVEL CITY PROJECT 9736
Approved Date
10/20/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� •�_�� ENCLOSURE (1) <br /> October 14, 1997 <br /> ARCHITECTS <br /> ENGINEERS <br /> , ;,, _ <br /> ; ;...... <br /> > Lighting Upgrad�e - Parl�ing Gara�ge-C;>Lower �:evel >> ;, ; <br /> ; <br /> - _ �i of Decatur Prr�ject 9736 ; ; : ; <br /> _. , <br /> > �Y <br /> PROJECT PLAN <br /> 1. PRODUCT- PROJECT ADMINISTRATION <br /> ACTIVITIES: <br /> 1.01 Acquire field data, previous designs and as-built information, technical design <br /> criteria, and standards controlling final design. <br /> 1.02 Determine standards, specifications and special conditions applicable to the <br /> project. <br /> 1.03 Meet with City staff to determine desirable material and equipment to be used <br /> for the project. <br /> 1.04 Prepare meeting minutes recording meetings with City and transmit copy to City. <br /> 2. PRODUCT- PRELIMINARY DESIGN <br /> ACTIVITIES: <br /> 2.01 Prepare Preliminary Lighting System Design. <br /> 2.02 Prepare draft outline of Project Manual <br /> 2.03 Prepare Preliminary Construction Cost Estimate <br /> 2.04 Submit Preliminary Design to City for review and comment. <br /> 3. PRODUCT- FINAL DESIGN <br /> ACTIVITIES: <br /> 3.01 Revise Preliminary Design per City staff review comments. <br /> 3.02 Revise Preliminary Project Manual per City staff review comments. <br /> 3.03 Revise Preliminary Construction Cost Estimate per City staff review comments. <br /> 3.04 Submit Final Design to City. <br /> BWC#009-9701 Page 1 of 2 II�I <br />
The URL can be used to link to this page
Your browser does not support the video tag.