Laserfiche WebLink
� •�_�� ENCLOSURE (1) <br /> October 14, 1997 <br /> ARCHITECTS <br /> ENGINEERS <br /> , ;,, _ <br /> ; ;...... <br /> > Lighting Upgrad�e - Parl�ing Gara�ge-C;>Lower �:evel >> ;, ; <br /> ; <br /> - _ �i of Decatur Prr�ject 9736 ; ; : ; <br /> _. , <br /> > �Y <br /> PROJECT PLAN <br /> 1. PRODUCT- PROJECT ADMINISTRATION <br /> ACTIVITIES: <br /> 1.01 Acquire field data, previous designs and as-built information, technical design <br /> criteria, and standards controlling final design. <br /> 1.02 Determine standards, specifications and special conditions applicable to the <br /> project. <br /> 1.03 Meet with City staff to determine desirable material and equipment to be used <br /> for the project. <br /> 1.04 Prepare meeting minutes recording meetings with City and transmit copy to City. <br /> 2. PRODUCT- PRELIMINARY DESIGN <br /> ACTIVITIES: <br /> 2.01 Prepare Preliminary Lighting System Design. <br /> 2.02 Prepare draft outline of Project Manual <br /> 2.03 Prepare Preliminary Construction Cost Estimate <br /> 2.04 Submit Preliminary Design to City for review and comment. <br /> 3. PRODUCT- FINAL DESIGN <br /> ACTIVITIES: <br /> 3.01 Revise Preliminary Design per City staff review comments. <br /> 3.02 Revise Preliminary Project Manual per City staff review comments. <br /> 3.03 Revise Preliminary Construction Cost Estimate per City staff review comments. <br /> 3.04 Submit Final Design to City. <br /> BWC#009-9701 Page 1 of 2 II�I <br />