Laserfiche WebLink
Project............................Traffic Signal Reconstruction: , ENGINEER'S �je.Enterprises,Inc. Egizii Electric,Inc. <br /> ' ESTIMATE . <br /> Oakland/Grand,Van Dyke/Grand,Harrison/Monrce, iba Bodine Electric,Inc. 700 N.MacArthur Blvd. � <br /> Cantrell/Martin Luther King,and Eldorado/24th City Engineering Division 1845 N. 22nd Street Springfield,IL 62702 I <br /> Box 976 , <br /> tur,IL,62525 ', <br /> City Project....................9709 <br /> id Date.........................August 12, 1997 ' <br /> 5%BID BOND 5%BID BOND <br /> Time..............................10:00 a.m. <br /> PAY ITEM TOTAL PRICE TOTAL PRICE TOTAL <br /> IJivIT UANTITY PRIC TOTAL <br /> VC CONDUIT,AUGERED 3" LF 844 12.85 10,845.40 13.61 11,486.84 12.03 10,153.32 <br /> HOLE EA. 13 861.00 11,193.00 693.85 9,020.05 952.60 12,383.80 <br /> UBLE HANDHOLE EA. 3 1543.00 4,629.00 1,160.95 3,482.85 1,933.80 5,801.40 <br /> GiJLFBOX JLINCTTON EA. 22 260.00 5,720.00 226.80 4,989.60 296.45 6,521.90 <br /> LECTRIC CABLE IN CONDiJTT,600V(3�,P-TYPE USE) LF 1,186 2.50 2,965.00 0.37 438.82 0.71 842.06 <br /> 1/C N0. 10 <br /> ELECTRIC CABLE IN CONDUIT,NO. 14 3/C LF 1,302 0.70 911.40 0.61 794.22 OJ4 963.48 <br /> LECTRIC CABLE IN CONDiJfT,NO. 14 5/C LF 7,290 0.86 6,269.40 0.75 5,467.50 0.73 5,321.70 <br /> LECTRIC CABLE IN CONDUIT,NO. 14 7/C LF 580 0.89 516.20 0.89 516.20 1.11 643.80 <br /> ' LECTRIC CABLE IN CONDUTT,NO. 18,3 PAIR LF 6,820 0.72 4,910.40 0.89 6,069.80 0.77 5,251.40 <br /> LECTRIC CABLE IN CONDiJTT,SERVICE,N0.6 2/C LF 36 1.75 63.00 1 J8 64.08 2.55 91.80 <br /> Page 3 <br />