......Traffic Si Reconstruction: ENGINEER'S �th e Ente rises,Inc. � 'zii Electric,Inc.
<br /> roject...................... g� ESTIMATE .l 1P �
<br /> Oakland/Grand,Van Dyke/Grand,Harrison/Monrce, Bodine Electric,Inc. 700 N.MacArthur Blvd.
<br /> Cantrell/Martin Luther King,and Eldorado/24th City Engineering Division 1845 N.22nd Street Springfield,II,62702
<br /> Box 976
<br /> ecatur,IL,62525
<br /> City Project....................9709
<br /> id Date.........................August 12, 1997
<br /> 5%BID BOND 5%BID BOND
<br /> Time..............................10:00 a.m.
<br /> PAY ITEM TOTAL PRICE TOTAL T PRICE TOTAL
<br /> iJNIT UANTITY PRIC TOTAL
<br /> STEEL COMBINATION MAST ARM ASSEMBLY AND EA. 1 2900.00 2,900.00 3,430.03 3,430.03 3,297.80 3,297.80
<br /> LE,40 FT
<br /> STEEL COMBINATION MAST ARM ASSEMBLY AND EA. 2 3100.00 6,200.00 3,962.12 7,924.24 3,765.85 7,531.70
<br /> POLE,46 FT
<br /> ONCRETE FOiJNDATTON,TYPE A LF 42 133.00 5,586.00 104.09 4,371.78 143.55 6,029.10
<br /> CONCRETE FOiJNDATION,TYPE D LF 9 251.00 2,259.00 212.22 1,909.98 263.45 2,371.05
<br /> CONCRETE FOTJNDATTON,TYPE E,24"DIA. LF 55 93.00 5,115.00 85.60 4,708.00 99.13 5,452.15
<br /> CONCRETE FOUNDATION,TYPE E,30"DIA. LF 99 97.00 9,603.00 88.88 8,799.12 102.23 10,120.77
<br /> RILL EXISTING HANDHOLE EA 9 300.00 2,700.00 159.84 1,438.56 118.25 1,064.25
<br /> SIGNAL HEAD,POLYCARBONATE,1-FACE,3-SECTION EA. 14 400.00 5,600.00 348.30 4,876.20 434.50 6,083.00
<br /> RACKET MOUNTED
<br /> SIGNAL FiEAD,POLYCARBONATE, 1-FACE,3-SECTTON EA. 26 430.00 11,180.00 387.29 10,069.54 439.45 11,425.70
<br /> MAST ARM MOUNTED
<br /> SIGNAL HEAD,POLYCARBONATB, 1-FACE,5-SECTION EA. 2 576.00 1,152.00 517.78 1,035.56 583.00 1,166.00
<br /> MAST ARM MOUNTED
<br /> Page 5
<br />
|