My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R97-107 AUTHORIZING AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
1997
>
R97-107 AUTHORIZING AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 9:34:18 AM
Creation date
4/18/2016 9:34:17 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R97-107
Res Ord Title
AUTHORIZING AGREEMENT ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Approved Date
7/21/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL-15-97 TUE 11:23 IEPA WATER FAX N0. 2117851225 P, 05 <br /> ' � aqr.M+.nt tro.� <br /> OTHER DiREGTED AGTNITtES <br /> 9. The Recipierrt ShaU be availabk fcr coordirration and propress briefinps. The c�ates and <br /> loations of these briefin9s shal! be specif�ed by the INi�as EPA in consultation vvitl� the <br /> Recipient during the course of the project. <br /> 10. The Recipient shaU submit a written progress repoct by the fifteenth(15th)of Jarn,uy.Apn7, <br /> July. 2utd October� occurring dttring the Agceement Period. VVheneti+er praciical submit <br /> progress reports that have b¢en copied doublQ-sided to the INinois EPA <br /> 11. The Reapierrt shall submit dociunentation ot administrativve and flnancial mech�ni�ms <br /> establisheci to provide for the Ionq-term maintarzamce of instaUed best mana�ement <br /> practices. <br /> 12. Alt produCis and materials produced through the imptemerttation of this project shaR indude <br /> a statement ideMNying Section 319 of the Clean Water Ad as a source of financia� <br />' assistance. <br /> 13. All produds produced and aQ work performed by the RecipisM utider tttis Ag�neM sh811 <br /> be subject to review �nd approval by the Ulinoi� EPA to determine eligibility and <br /> acceptabiiity in meeting the terms and ir�tent of this Ayreement. <br /> Project Scheduie <br />, L� .omnletian dat� <br /> UWDOWNER TECHNfCA1 AND EDUCAT(ON SESSIONS <br /> 1. Dtaft Session Pacfcet September t, 1997 <br /> Final Session PacKet 30 days affier IEPA review of draft padcet <br /> 2. Subcontract/Job Descrip�on September 1, 1997 <br /> 3. Conduet Sessions with 20%of Operaeors (Yr 1) Jur�e 30, 199a <br /> COrtcluCi Sessiotls with aT1 AddiitOna!25%Of OperatotS (Yr 2j Jur1e 30, 1999 <br />� COST SHARE PROGRAM ANO BMP DESIGN SPECIFICATIONS <br /> 4. Cost Share Program Logispcs SeptembCr i, 1997 <br /> 5. BMP Dosigns May 30. 1999 <br /> 6. Drait Landown�r Contrxt �p��r�, 1997 <br /> Final Lartdown�r ConUact 30 Oays af0er lEPA r�view ot drafi contrdCt <br /> BEST MANAGEMENT PRACTICE IMPLEMENTATION <br /> 7- CompteK BMP InsteNBtion,Con�truction 8 Vegetation June 3Q,1999 <br />� Photognphic Docum�nbtion of BMP implementation ,lunQ 30, 1699 <br /> page 4 of 6 <br /> 6I4T <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.