My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R97-105 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
1997
>
R97-105 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 9:43:47 AM
Creation date
4/18/2016 9:43:46 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R97-105
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT LAKE DECATUR DAM IMPROVEMENTS REPLACEMENT OF HYDRAULIC SYSTEM CITY PROJECT 8918-D
Approved Date
7/7/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . _ � I <br /> .��f•DEc <br /> � �� , <br /> C <br /> v ro <br /> ��� <br /> '/[LINO�Y <br /> July 1, 1997 <br /> PUBLIC WORKS MEMORANDUM <br /> NO. 97-64 <br /> MEMORANDUM TO: Honorable Mayor and City Council <br /> FROM: James L.Williams, Jr., City Manager <br /> Bruce A. McNabb,P.E., Director of Public Works�� <br /> Stephen P. Swanson, P.E., City Engineer� <br /> John A. Smith,Water Production Manager ' <br /> SUBJECT: Lake Decatur Dam Improvements <br /> Replacement of Hydraulic System <br /> City Project 8918-D <br /> The last phase of the rehabilitation to the Lake Decatur Dam is the replacement of the <br /> hydraulic system controls, pumps, valves and piping and the electrical system controls and service <br /> for the operation of the bascule gates. There have not been any major repairs to the hydraulic <br /> system since its installation in 1955. This phase completes work that started on the dam <br /> rehabilitation approximately four years ago. The plans and specifications for this work were <br /> prepared, under contract to the City, by the consulting firm of Black&Veatch(B&V). <br /> The project was advertised and bids were received and opened on May 7, 1997. The <br />� results of the letting (a bid tabulation is attached) are as follows: <br />, Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over f-Under) <br /> Engineer's Estimate(Black&veatch) $ 897,000.00 --- <br /> Osage Constructors, Inc. $ 980,500.00 9.31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.