Laserfiche WebLink
� � l <br /> Project............................Milling and Rehabilitation ENGINEER'S ESTIMATE Merrill's Contrecto�s,Inc. Dunn Company Illinois valley Paving Co.. . ,r <br /> City Project....................9708 1900 E.Truman Rd. 724 N. Mercer St. PO Box 648 ' <br /> Section...........................97-00000-02-GM Springfield, IL 62703 Decatur, IL 62522-1699 Decatur, IL 62525 . <br /> Bid Date.........................Ju�e 26, 1997 <br /> Time...............................10:15 A.M. <br /> 5%BID BOND 5%BID BOND 96 BID BOND <br /> Apparent Low Btdder <br /> PAY ITEM UNIT QTY UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> PRICE PRfCE PRICE PRICE <br /> Cold Millin FV1IM SY 194,000.00 1.70 3329,800.00 1.58 $306,520.00 1.73 a335,620.00 1.78 3345,320.00 <br /> Area Reflective Crack Control Non-MFT SY 194,000.00 1.05 a203,700.00 0.91 $176,540.00 1.05 b203,700.00 1.10 �213,400.00 <br /> Bituminous Material Prime Coat AC20 GAL 58,200.00 1.50 $87,300.00 0.88 $51,216.00 1.35 a78,570.00 1.35 378,570.00 <br /> r ate Prime Coat TON 390.00 13.40 b5,226.00 13.33 $5,198.70 13.50 35,265.00 14.00 35,460.00 <br /> Bituminous Concrete Surface Course,Class I TON 19,000.00 45.00 3855,000.00 42.76 $812,440.00 43.95 b835,050.00 44.70 3849,300.00 <br /> Levelin Binder Machine Method TON 5,000.00 45.00 $225,000.00 46.43 5232,150.00 44.50 5272,500.00 44.70 a223,500.00 <br /> Valve Box Millin EA 150.00 145.00 $21,750.00 146.45 $21,967.50 143.00 321,450.00 140.00 a21,000.00 <br /> Manhole/Catch Basin Millin EA 200.00 155.00 $31,000.00 155.36 $31,072.00 150.00 530,000.00 150.00 330,000.00 <br /> alve Box Ad'usted EA 50.00 110.00 35,500.00 200.45 $10,022.50 105.00 35,250.00 110.00 E5,500.00 <br /> Valve Box to be Re laced EA 2.00 370.00 E740.00 395.55 5791.10 360.00 b720.00 350.00 E700.00 <br /> Manhole Frame&Lid,T I,CL EA 2.00 590.00 51,180.00 506.70 $1,013.40 575.00 a1,150.00 550.00 �1,100.00 <br /> Mixture for Cracks,Joints and Flan ewa s TON 50.00 150.00 a7,500.00 174.99 $8,749.50 150.00 E7,500.00 150.00 37,500.00 <br /> TOTAL BID AS CORRECTED S1 773 696.00 S1 657 680.70 31 746 775.00 1 781 350.00 <br /> Percent Over or Under ENGINEER'S ESTIMATE 6.54 1.52 0.43 <br /> The Apparent Low Bidder is: Merrill's Contractors, Inc. <br /> Stephen P.Swanson,City Engineer Date <br />