Laserfiche WebLink
•IUinois De artm�� �� C�� �-�h- �g <br /> �] Municipal Estimat� <br /> ' . of Transpo�ation Maintenance Cost_ <br /> Period from January 1, 19 97 , to Oecember3l, 19 97 Municipa(ity oecatur, t�iir.ois <br /> Estimated Cost of Maintenance Operations � <br /> Material, E�uipment or Labor CGera:ic <br /> � Maintenance Operation Quantity Unit Amount Cosc <br /> (No.-Oescription-Totai Quantity) Item and Specitication Reference and Unit I Cost ( <br /> Street Resurfacinq (Conventional) Area Reflective Crack Control 85 000 SY <br /> 97-00000-01GM Bit. Conc._ Surf. Crse. Class I 7 500 TON <br /> City Project 9707 Leveling Binder (Machine Method) 2 500 TON 45.00 112 500.0 <br /> Bit. Materials CSS-IH Prime Coat GAL 1.10 1 650.0 <br /> Bit. Materials AC20 Prime Coat 8 250.0 <br /> AqqreQate (Prime Coat 100 TON 13.40 1 340.0 <br /> ' Pavement Removal Surf. Crse. (Asohalt 3,500 SY 8.75 30 625.0 <br /> Pauement Rem S Cr Con r �1 000 SY 11.50 11 500.0 <br /> Valve Bo 2 EA 180.00� 360.0 <br /> �n 2 EA 2 0 470.0 <br /> Valve Box to be Ad usted (As halt) EA 1 00 6 825.0 <br /> Valve Box to be Ad'usted (Concrete) 3 EA 675.0 <br /> Manhole to be Ad usted (As halt) 3 EA 10.0 <br /> Manhole to be Adjusted (Concrete) 3 EA 205.0 615.0 <br /> Mixture for Cracks, Joints & Flanqeway 30 150.0 4 500.0 <br /> SOTAL 636,570.00 <br /> Millina & Rehabilitation Cold Mil n FWM SY 0.0 <br /> 97-00000-02GM Area Reflective Crack Control gy <br /> Citv Proiect 9708 _Bitumino M r Pri e C a 48 000 1.5 72 000. <br /> Agqre ate (Prime Coat) 320 TON 13.4 4 288. <br /> Bitiiminous Conc. Surface Course CLS I 13 500 TON 45.0 '607 500. <br /> Levelin Binder (Machine Method) 5 000 TON 45 0 225 000. <br /> Valve Box Millin 150 EA � 4� 21 750. <br /> Manhole/Catch Basin Millin 200 EA 31 000. 0 <br /> Valve Box Adiusted EA 0 <br /> Valve Box to be Re laced p <br />� Manhole Frame & Lid T e 1 2 EA 590.0 1 180. <br /> Mixture for Cracks Joints & Flan ewa s 50 TON 150.0 7 500. 0 <br /> TOTAL 1,416,458.00 <br /> Miscellaneous Traffic Siqnals TOTAL 10,000.00 <br /> Traffic Sianal Maintenance TOTAL � 230,000.00 <br /> � <br /> Total Estimated Maintenance Cost 2,293,028.00 <br /> Submitt ay ,�Q 97 Approved ��} , 19� <br /> b "� rn��OG� �-- -- � -�1�-/ �� <br /> `�_' i _✓i � <br /> Y <br /> ,� M � al Officia Title Cistric: Engineer <br /> �. <br /> ` SuCmit Four (4? Copies to District cn�ine�r <br /> BLR-8202(Fev.,s." <br />