Laserfiche WebLink
[n[er,overnmental Cooperadon ,�greemen[ <br /> , ' Hickory Point West Sewer - Part II <br /> -) CONSTRUCTlON TIi�1E <br /> The Hickorv Point West Sewer- Parr fl will be�;in construcrion during the i99�_1999 <br /> DISTRICT fiscal year(��tay I, 1998 - April �0. 1999.) <br /> -�) ESTIMATED PROJECT COST <br /> The foliowin` itemized list oti Project Costs is an estimate ot project costs and is <br /> included onh�as a guide paramete;. �ctual costs of the ro'ect� � <br /> p � �ill be zstablished bv ' a <br /> bids an� <br /> actual costs of construction services. <br /> aj Facility Plan Revision �'�, (? <br /> Compieted under <br /> previous a�reement <br /> b) .�rchaeological Survev <br /> � Completed under <br /> previous a=reement <br /> c) Hickon,� Point West Se��er- Part 11 <br /> Construction cost with contin_encv �—��6.000.00 <br /> d) Desi�n of Hickory Point West Sewer- <br /> Parr II � 19.�00.00 <br /> e) Conscruction supervision of the Hirkorv Point � =0.000. �� <br /> West Sewer-Part (1 " �� <br /> t) Legal (Non-Loan Eli�ible) <br /> � 1,000.00 <br /> �) Right-of-Way& Right-of-Way A�ent <br /> (Non-Loan Eligible) � ���'�� <br /> Estimated Project Cost � �250,500.00 <br /> `) FU?JDING AND REPAYMENT <br /> This project will be funded by a loan from the State oPlllinois Water Pollution Concrol <br /> Revolvin� Fund(WPCRF) to the DISTR(CT. <br /> The loan will be repaid by the D[STRICT in accordance with the State Loan <br /> Requirements, and Loan A�reement. <br /> The loan will be for a term of twenty(?0)�ears at simple interest, as stated in the Loan <br /> A`�reemen., on the unpaid principal balance. Principal and interest will be payable in semi-annual <br /> 3 <br />