Laserfiche WebLink
14-NOV-96 PAGE 2 <br /> ILLINOIS CENTRAL RAILROAD <br /> ENGINEERING DEPARTMENT <br /> OFFICE OF GENERAL MANAGER-C&S <br /> Decatur, I1. Est 1045-303 <br /> Estimated cost of Signal work to upgrade control circuits and add <br /> Cantilevers at Garfield Avenue. <br /> Northern Region Val Sec I1-2 <br /> UNIT TOTAL <br /> ITEM DESCRIPTION QUANTITY UNIT COST COST <br /> FAPG <br /> CABLE,2C/6 TW. , 120-D (0) 300. FEET @ 0. 68 204 .00 '� <br /> CABI,E,Sc/6, 121-M (0) 500. FEET @ 2 .58 1290.00 <br /> CABLE,7c/6, 121-N (0) 300. FEET @ 3 . 32 996. 00 <br /> LOCK,SECURITY,MODEL H10 2 . EACH @ 16.95 33 .90 <br /> MISC.SIGNAL MATERIAL 1. L.S. @ 500. 00 500. 00 <br /> CROSSING MATERIALS PACKAGE <br /> GCP3000ND2,80150-111 2 . EACH @ 15604 . 00 31208 .00 <br /> NARROW BAND SHUNT, 62775-3497 3 . EACH @ 370. 00 1110.00 <br /> BI-DI SIMULATOR 1. EACH @ 679. 00 679. 00 <br /> EQUIPMENT RACK 2 . EACH @ 311. 00 622 . 00 <br /> SURGE PROTECTION PACKAGE l. EACH @ 1200. 00 1200. 00 <br /> CONTROLI,ER XING, 91075-1 1. EACH @ 5313 . 00 5313 . 00 <br /> RECORDER INTERFACE, 80025 2 . EACH @ 216. 00 432 .00 <br /> CANTILEVER,MD W, 071300-K24 2 . EACH @ 6865. 00 13730.00 <br /> LAMP ASSEM 401B JM-W (12) 2 . EACH @ 1170. 00 2340. 00 <br /> LAMP ASSEM 401B MM-W (12) 2 . EACH @ 1175. 00 2350. 00 <br /> LAMP ASSEM 401A MM-W (12) 2 . EACH @ 642 . 00 1284 . 00 <br /> LAMP ASSEM 401A JM-WNR (12) 2 . EACH @ 646. 00 1292 . 00 <br /> ADAPTER,BELL ASSEM. 4"TO 12" 1. EACH @ 49 .75 49.75 <br /> BELL,ELECTRONIC 1. EACH @ 218. 00 218. 00 <br /> CKT, PSO TRK W/7A355A-F 2 . EACH @ 2069. 00 4138.00 <br /> RELAY,ST, 500 OHM,SPEC 310-D 4 . EACH @ 393 . 00 1572 . 00 <br /> RELAY SOCKET,TYPE ST 4 . EACH @ 31.90 127 . 60 <br /> RECTIFIER,CRC20EC-12V 1. EACH @ 440. 00 440. 00 <br /> BATTERY,GNB 265AH 13 . EACH @ 180. 00 2340. 00 <br /> FDN CANT LW PRF 2 . EACH @ 2090. 00 4180. 00 <br /> BOX, BATTERY, 6 CELL 3 . EACH @ 430. 00 1290. 00 <br /> CASE, SPEC 534-B 1. EACH @ 534 . 00 534 . 00 <br /> INST HOUSE, 6X8, 531-C s 1. EACH @ 6547 . 00 6547. 00 <br /> 5 MAN GANG 20. DAY @ 900. 00 18000. 00 <br /> PRELIMINARY ENGINEERING l. L.S. @ 2400. 00 2400. 00 <br /> CONSTRUCTION ENGINEERING 1. L.S. @ 550. 00 550. 00 <br />