Laserfiche WebLink
Affidavit of Availability <br /> ' ���1110LS ��2rt(Y1PJlt For the Letting of 3/17/2016 <br /> of Transportafion (Letting date) <br /> ' Bureau of Construction Instructions: Complete this fortn by either typing or using black ink. <br /> 2300 South Dirksen Parkway/Room 322 "Authorization to Bid"will not be issued unless both sides of this fortn are <br /> Springfield, ���11101S 62764 �mpleted in detail. Use additional forms as needed to list all work. <br /> Part I. Work Under Contract <br /> , List below all woric you have under contract as either a prime contractor or a subconVactor. It is required to include all pending low bids not <br /> yet awarded or rejected. In a joint venture,list only that portion of the work which is the responsibility of your company. The uncompleted dollar <br /> value is to be based upon the most recent engineers or owners estimate,and must include woAc subcontracted to others. If no work is <br /> contracted,show NONE. <br /> , 1 2 3 4 Awards Pending <br /> Contract Number I-13-4618 89656 66982 78380 None <br /> , Contract With Tollway IDOT IDOT IDOT <br /> Estimated Completion Date 6/30115 3131/16 1211N6 17130117 <br /> Accumulated <br /> Total Contract Price 479,654.71 1,528,816.18 430,972.00 346,559.50 Totals <br /> ' Uncompleted Dollar Value if Firm is the <br /> Prime Contractor 753,992.58 910,950.58 <br /> Uncompleted Oollar Value if Firm is the <br /> , Subcontrector 354,733.76 430,972.00 346,559.50 2,219,111.77 <br /> 3,130,062.35 <br /> Part II. Awards Pending and Uncompleted Work to be done with your own forces. <br /> ' List below the uncompleted dollar value of work for each contract and awards pending to be completed with your own forces. All work Accumulated <br /> Subcontracted to others will be listed on the reverse of this fortn. In a joint venture,list only that portion of the work to be done by your <br /> company. If no work is contracted,show NONE. TOY�IS <br /> Earthwork 0.00 <br /> ' Portland Cement Concrete Paving 0.00 <br /> HMA Plant Mix 0.00 <br /> ' HMA Paving 0.00 <br /> Clean&Seal CrackslJoints 0.00 <br /> Aggregate Bases&Surfaces 0.00 <br /> , Highway,R.R.and Waterway Structures 0.00 <br /> Drainage 0.00 <br /> Electrical 0.00 <br /> ' Cover and Seal Coats 0.00 <br /> Concrete Construction 0.00 <br /> , Landscaping 0.00 <br /> Fencing 97,354.50 94,788.75 284,346.45 <br /> Guardrail 71,267.26 753,992.58 94,939.25 346,559.50 1,840,385.90 <br /> � Painting 0.00 <br /> Signing 0.00 <br /> Cold Milting,Planning&Rotomilling 0.00 <br /> ! Demolition 0.00 <br /> Pavement Markings(Paint) 0.00 <br /> , Other Construction(List) 0.00 <br /> Bridge Rail 186,112.00 247,244.00 1,005,330.00 <br /> 0.00 <br /> ' Totals 354,733.76 753,992.58 430,972.00 346,559.50 0.00 3,130,062.35 <br /> Disclosure of this information is REQUIRED to accomplish the statutory purpose as outlined in the"Illinois Procurement Code". Failure to comply will <br /> result in non-issuance of an"Authorization To Bid." This form has been approved by the State Forms Management Center. <br /> ' <br /> ' Printed 3/14/2016 Page 2 of 15 BC 57(Rev.08/17/10 <br />