My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2016-37 TO APPROPRIATE MOTOR FUEL TAX FUNDS Lost Bridge Road
COD
>
City Clerk
>
RESOLUTIONS
>
2016
>
R2016-37 TO APPROPRIATE MOTOR FUEL TAX FUNDS Lost Bridge Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 8:25:14 AM
Creation date
4/19/2016 8:24:40 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2016-37
Res Ord Title
TO APPROPRIATE MOTOR FUEL TAX FUNDS FOR THE IMPROVEMENT OF LOST BRIDGE ROAD BY MUNICIPALITY UNDER THE ILLINOIS HIGHWAY CODE CITY PROJECT 2015-27
Approved Date
4/4/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A�davit of Availability <br /> ' ���IIIOLS �p3Ct1'Y1�it For the Letting of 3/17/2016 <br /> of Transportat�on (Letting date) <br /> � Bureau of Construction Instructlons: Complete this form by either typing or using black ink. <br /> 2300 South Dirksen Parkway/Room 322 "Authorization to Bid"will not be issued unless both sides of this fortn are <br /> Springfield, ���If101S 62764 completed in detail. Use additional forms as needed to list all work. <br /> Part I. Work Under Contract <br /> � List below all work you have under contract as either a prime contractor or a subcontractor. It is required to include all pending low bids not yet awarded or <br /> rejected. In a joint venture,list only that portion of the work which is the responsibility of your company. The uncompleted dollar value is to be based upon the most <br /> recent engineer's or owners estimate,and must inGude work subcontracted to others. If no work is contracted,show NONE. <br /> 1 2 3 4 Awards Pending <br /> Contract Number Rehab Inst Wrigley Various <br /> Contract With Power Pepper Various <br /> ' Estimated Completion Date 6/30115 4H/75 Various <br /> Accumulated <br /> Total Contract Price 474,474.00 795,000.00 5,927,398.63 Totals <br /> � Uncompleted Dollar Value if Firm is the <br /> Prime Contractor 910,950.58 <br /> Uncompleted Dollar Value if Firm is the <br /> Subcontractor 210,214.00 795,000.00 4,326,011.01 7,550,336.78 <br /> 8,461,287.36 <br /> Part II. Awards Pending and Uncompleted Work to be done with your own forces. <br /> List below the uncompleted dollar value of work for each contract and awards pending to be completed with your own forces. All work ACCUmUlBt@d <br /> , Subcontracted to others will be listed on the reverse of this form. In a joint venture,list only that portion of the work to be done by your <br /> company. If no woric is contracted,show NONE. TOt218 <br /> Earthwork 0.00 <br /> ' Portland Cement Concrete Paving 0.00 <br /> HMA Plant Mix 0.00 <br /> HMA Paving 0.00 <br /> ' Clean&Seai CrackslJoints 0.00 <br /> Aggregate Bases&Surfaces 0.00 <br /> Highway,R.R.and Waterway Structures 0.00 <br /> � Orainage 0.00 <br /> Electrical 0.00 <br /> � Cover and Seal Coats 0.00 <br /> Concrete Construction 0.00 <br /> Landscaping 0.00 <br /> ' Fencing 210,214.00 795,000.00 1,519,438.05 2,808,998.50 <br /> Guardrail 1,891,433.46 3,731,819.36 <br /> � Painting 0.00 <br /> Signing 0.00 <br /> Coid Milling,Planning&Rotomilling 0.00 <br /> �Demolition 0.00 <br /> Pavement Markings(Paint) 0.00 <br /> Other Construction(List) 0.00 <br /> ,Bridge Rail 915,139.50 1,920,469.50 <br /> 0.00 <br /> �Totals 210,214.00 795,000.00 4,326,011.01 0.00 0.00 8,461,287.36 <br /> Disclosure of this information is REQUIRED to accomplish the statutory purpose as outlined in the"Illinois Procureme�t Code". Failure to comply will <br /> result in non-issuance of an"Authorization To Bid." This form has been approved by the State Forms Management Center. <br /> ' <br /> , Printed 3/14/2016 Page 3 of 15 BC 57(Rev.08/17/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.