Laserfiche WebLink
Project...........................Annual New Sidewalk Program ENGINEER'S ESTIMATE Bodine Services,Inc. Christy-Fdtz,Inc. Otto Baum 8 Sons,Inc. � <br /> 5350 E.Firehouse Rd. 740 S.Main St. 1788 Hubbard Ave. • <br /> City PfojeCt...................9621 Ciry of Decawr Decatur,IL 62521 Decatur,IL 62521 Decatur,IL 62526 <br /> Engineering Division <br /> Ph: 87Cr1000 <br /> Bid Date.......................March 27, 1997 Fax:976-1014 <br /> Time...............................2:30 P.M. sx Bid Bond SX Bld Bond SX Bid Bond <br /> PAY ITEM UNIT QTY UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL <br /> PRICE PRICE PRICE PRICE <br /> Portland Cement Concrete Sidewalk S.F. 24 500 3.25 79625.00 3.14 76930.00 3.10 73,930.00 3.40 83,300.00 <br /> Drivewa Curb Removal L.F. 80 8.00 640.0o to.00 eoo.00 2s.00 2,000.00 33.00 2,soo.0o <br /> Relocate Domestic Water Service Box EA. 5 150.00 750.00 150.00 750.00 900.00 4,soo.00 1so.00 750.00 <br /> TOTAL BID AS CORRECI'ED 581,015.00 S'I8,480.00 582,430.00 586,850.00 <br /> t Ov d G 3.13 1.77 7•20 <br /> 1 <br />