Laserfiche WebLink
� <br /> h. Construction staging and constructability. <br /> i . Residuals (lime sludge) , storage, disposal , antl <br /> handling. <br /> j . Process mechanical systems which includes chemical feed, <br /> raw and treated water pumping, basin equipment and <br /> filters. <br /> k. Building electrical which includes lighting, <br /> distribution, and service panels. <br /> 1 . Electrical service to the facility. <br /> m. Raw water intakes. <br /> 3. Review available construction materials information to <br /> determine if asbestos or lead based paints were used. If <br /> used, determine the impact on construction costs and <br /> schedules. <br /> 4. Develop conceptual layouts for treatment alternatives and <br /> expansion options. <br /> 5. Develop preliminary opinions of probable construction costs <br /> to upgrade, rehabilitate, and expand the facilities. <br /> 6. Evaluate approaches to construction which will enable <br /> facilities to remain in operation during construction. <br /> 7. Develop staffing requirements for partial automation and <br /> control verses maximum practical automation and control . <br /> 8. Project operation and maintenance costs associated with <br /> partial automation and control verses maximum practical <br /> automation and control . <br /> SLW3:023 A-5 April 1, 1997 <br />