Laserfiche WebLink
, Y <br /> k o <br /> F•D <br /> E <br /> O C <br /> � �a <br /> C <br /> v �e <br /> � <br /> '/[LINO�Y <br /> March 25, 1997 <br /> PUBLIC WORKS MEMORANDUM <br /> NO. 97-28 <br /> MEMORANDUM TO: Honorable Mayor and City Council <br /> FROM: James L. Williams, Jr., City Manager i� ' <br /> Bruce A. McNabb,P.E.,Director of Public Works ��1�`� <br /> Stephen P. Swanson,P.E., City Engineer�� <br /> John A. Smith,Water Production Manager <br /> SUBJECT: Engineering Design Services for North Water Treatment Plant <br /> Rehabilitation or Replacement Project <br /> City Project 9644 <br /> The Department of Public Works issued a Request for Proposals (RFP) in November 1996, <br /> for engineering design services for the North Water Treatment Plant Rehabilitation or <br /> Replacement Project. The issuance of the RFP was a follow-up to the October 28, 1996, City <br /> Council meeting at which City staff presented its recommendations for water system <br /> improvements following the completion of the Water Resources/Storage/Production Study <br /> prepared for the City by HARZA Consulting Engineers and Scientists. The recommendations <br /> presented by Staff included the need to upgrade and expand the City's North Water Treatment <br /> Plant (NWTP) to meet predicted water production demands. These improvements need to be <br /> completed as soon as possible. <br /> The RFP was prepared by staff and included the preliminary scope of work expected by the <br /> City based on staffs understanding of the project needs. It was decided to complete the design <br /> process in two phases. The first phase would be a feasibility study and the second phase the final <br /> design. In the first phase, the consultant would evaluate the existing NWTP which was <br /> constructed in 1975. This includes the condition of the buildings, the equipment and the water <br /> treatment process. The consultant would use this information to determine the estimated cost to <br /> upgrade and expand the e�cisting plant to meet future production needs and expected future water <br /> treatment standards. The consultant will also estimate the cost for the City to construct a new <br /> water treatment plant to replace the e�sting NWTP. <br />