|
Project............................Traffic Signal Reconshuction: ENGINEER'S
<br /> ESTIMATE thje Enterprises,1nc. Egizii Electric,Ina J.F.Edwards Constcucrion
<br /> Oakland�Main ba Bodine Electric,Inc. 700 N.MacArthur Blvd. .
<br /> MI.K/V�'ood ity Engineering Division 1845 N.22nd Street Spring8eld,IL 62702 220 S.Chicago St.
<br /> MLK/Prairie Box 976 PO Box 49
<br /> tur,IL 62525 seo,IL 61254
<br /> City Project....................9609
<br /> Bid Date.........................December 9,1996
<br /> 5%BID BOND 5%BID BOND 5%BID BOND
<br /> Time..............................10:00 a.m.
<br /> *Math Error Highlighted
<br /> PAY TI'EM TOTAL
<br /> UNIT UANTITY TI'PRIC TOTAL UNIT PRICE TOTAL UNTf PRICE TOTAL UNIT PRICE TOTAL
<br /> SIGNAL HEAD,POLYCARBONAT'E,2-FACE,1-3 SECTION EA 4 1150.00 4,600.00 895.52 3,582.08 933.63 3,734.52 1,133.00 4,532.00
<br /> AND 1-5 SECTION,BRACKET MOUNfED
<br /> SIGNAL HEAD,POLYCARBONATE,1-FACE,3-SECIION EA 2 490.00 980.00 312.69 625.38 399.58 799.16 650.00 1,300.00
<br /> BRACKET MOUNTED
<br /> TRAI�'FIC CONTROL&PROTECTTON,STANDARD 2405 LS 1 3900.00 3,900.00 2,291.18 2,291.18 5,176.19 5,176.19 1,250.00 1,250.00
<br /> TRAFFIC CONl'ROL&PROTECTTON,STANDARD 2404 LS 1 3900.00 3,900.00 2,225.78 2,225.78 4,905.79 4,905.79 1,190.00 1,190.00
<br /> TRAFFIC CONTROL&PROT'ECITON,STANDARD 2402 LS 1 6000.00 6,000.00 2,073.18 2,073.18 3,484.00 3,484.00 1,050.00 1,050.00
<br /> COMBINATION CURB AND GUTTER,TYPE B6:24 LF 70 35.00 2,450.00 15.65 1,095.50 15.50 1,085.00 14.90 1,043.00
<br /> COMBINATTON CURB AND GUITER,1'YPE B6:12 LF 70 25.00 1,750.00 15.49 1,084.30 15.34 1,073.80 14.75 1,032.50
<br /> TOTAL BID(AS CORRECTED) S305,105.60 5259,361.50 5263,314.95 5327,987.85
<br /> ercent Over or(Unda)ENGiNEER'S ESTIIvfAT'E (14.99) (13.70) 7.50
<br /> .
<br /> , - Page 4
<br />
|