My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R96-176 ACCEPTING PROPOSAL
COD
>
City Clerk
>
RESOLUTIONS
>
1996
>
R96-176 ACCEPTING PROPOSAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 3:40:27 PM
Creation date
4/22/2016 3:40:23 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R96-176
Res Ord Title
ACCEPTING PROPOSAL DATA RADIO, INC.
Approved Date
12/16/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. , i <br /> . City of Decatur Mobile Data SysEem Acceptance Test Plan �I <br /> COMMUNICATION LINK VERIFICATION ACCEPTANCE TEST <br /> This section details the communication link verification test procedure. It is intended to '� <br /> exercise the RF link from the modems located at the central computer site through base ' <br /> radios to a mobile data device and back again. <br /> Test Preparation ' <br /> The test equipment consists of one test host and one mobile data device. The test host will <br /> be provided by DATAxA��o and is an IBM compatible laptop computer with a <br /> communications port for connection to the link under test. The test host executes a special <br /> test software package written for the purpose of performing these tests. The mobile data <br /> device is equipped with software for sending text messages to and from the test host. The <br /> test mobile is situated close to the base radio site so that the quality of the RF communication <br /> to and from the base radio is such that no errors are introduced to radio channel <br /> propagation phenomena. <br /> Test Procedure Overview <br /> The test requires at least one person at the test host and one person operating the mobile <br /> data device installed in a City vehicle. These people must be in contact with each other to <br /> coordinate their activities. DAT.�xA�10 personnel will perform the test witnessed by the <br /> City's project manager. The test consists of 25 messages which aze directed first from the <br /> mobile data device to the test host,and then from the test host to the mobile data device. <br /> The test host counts the number of inessages successfully received from the mobile data <br /> device and tabulates the results. The operator in the vehicle will check off the number of <br /> messages sent in both directions to compare with the test host printout. <br /> DATARADIO's engineers will examine the results,and present them to the City. Any <br /> deficiencies that fall into the responsibilities of DATAxAD�o will be corrected. Deficiencies <br /> that fall into the responsibilities of the City will be identified for City resolution. <br /> ��R/�7/O° <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.